<_x0034_01130415>
401130415 02 2017-05-30T09:18:20.387-06:00 47120 KERR MCGEE OIL & GAS ONSHORE LP
P O BOX 173779
DENVER CO 80217-3779 SHAYELYN MARSHALL 720 929 6907 720 929 7907 SHAYELYN MARSHALL REGULATORY ANALYST 2017-05-30T09:18:20.387-06:00 2017-05-30T09:18:19.637-06:00 UPLOADED shayelynmarshall 2016-10-13T16:14:56.953-06:00 shayelynmarshall DJREGULATORY@ANADARKO.COM 3.00000 false SHAYELYN.MARSHALL@ANADARKO.COM masonm masonm 2017-06-06T09:38:40.907-06:00 401130415 DR GAS SINGLE YELLOWHAMMER 30N-8HZ 13679 NWSW 8 1N 68W 6 569 WATTENBERG FWL 1713 90750 5061 FSL WELD HORIZONTAL 62 135 FWL FEE 200 FSL 8 FEE 1N 68W 160 Township 1 North, Range 68 West, 6th P.M. Section 8: SW/4 Weld County, Colorado FWL 50 0 FNL 8 211 1N 68W FEET FEET N N N Y OFFSITE Commercial Disposal Please see Comments section. Disposal description will not fit in space provided. 20010124 ANNULAR PREVENTOR DOUBLE RAM ROTATING HEAD 40.062895 -105.035360 2016-06-30T00:00:00-06:00 ROB WILSON 1.3 true false true false false false false false false false false false false false true FEE true applicant is owner 1242 FEET PROPOSED SPACING UNIT: 1N-68W Sec 5: SWSW 1N-68W Sec 6: SESE 1N-68W Sec 7: E2E2 1N-68W Sec 8: W2W2 1N-68W Sec 17: NWNW 1N-68W Sec 18: NENE 211 FEET true 318A OFFSITE Commercial Disposal true false false false false false false true true false false false ryan.hollinshead@anadarko.com false false 401130415 Drilling fluids disposal: KMG will reuse water-based drilling fluids to the maximum extent possible, at which point they will either be land applied or taken to a licensed, commercial disposal site; the decision will be based upon laboratory analysis of fluids. KMG will reuse oil-based drilling fluids to the maximum extent possible, at which point they will be returned to the fluids manufacturer for reconditioning or disposal at a licensed, commercial disposal site. Cuttings disposal: Water-based cuttings will be disposed of using a Centralized E&P Waste Management facility or a private spread field, depending on what is feasible at the time of drilling. Oil-based cuttings will be disposed of offsite and at a licensed, commercial disposal site. 401130415 401130415 FORM 2 SUBMITTED 401130415.pdf 401130415 401137548 EXCEPTION LOC WAIVERS YELLOWHAMMER PAD TWEL WAIVER.pdf 564388 401130415 401202743 WELL LOCATION PLAT YELLOWHAMMER 30N-8HZ PLAT.pdf 143333 401130415 401202744 DEVIATED DRILLING PLAN YELLOWHAMMER 30N-8HZ DEV DRLG PLAN.pdf 114365 401130415 401202745 DIRECTIONAL DATA YELLOWHAMMER 30N-8HZ DIR DATA.xlsm 33128 401130415 401227004 OPEN HOLE LOGGING EXCEPTION PAPA JO 2-25 35N2-17HZ 317.p OPEN HOLE EXCEPTION LETTER.pdf 200330 401130415 401228653 OFFSET WELL EVALUATION FINAL PAPA JO 2-25 35N2-17HZ OFFSET WELL EVAL.xlsx 45022 401130415 401229367 EXCEPTION LOC REQUEST YELLOWHAMMER PAD TWEL REQUEST 318A.a 318A.c (SHAYE).pdf 179528 401130415 401282978 PROPOSED SPACING UNIT YELLOWHAMMER 30N-8HZ PSU.pdf 224558 401130415 401130408 02A PAPA JO 2-25 35N2-17HZ PAD 985c1e94-29ce-4fb0-83a6-0ad29154c408 401130415 6 Drilling/Completion Operations 604c.(2).J. BOPE for Well Servicing Operations: Blowout prevention equipment will be used on any servicing operations associated with this well. Backup stabbing valves will be used during any future servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using low-pressure air and high-pressure fluid. false f62cf603-9665-43cd-b3d5-0b021b9b0ca1 401130415 1 Planning 604c.(2).Q. Guy Line Anchors: Guy line anchors will not be used. Base Beams will be used to stabilize the rig and removed after drilling. false 4a3b0082-c25d-4b55-ad21-25fea0f0b735 401130415 7 Drilling/Completion Operations 604c.(2).L. Drill Stem Tests: No drill stem tests are planned and none will be performed without prior approval from the Director. false 447d3eca-f219-451d-8bcb-4c7fcb37dac2 401130415 10 Drilling/Completion Operations Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling. false ab4a4171-4bd4-421f-ac08-30a9d55cb311 401130415 3 Drilling/Completion Operations 604c.(2).C. Green Completions: Temporary above ground polyethylene water pipelines will deliver water to location operations from larger trunk lines to reduce truck traffic and minimize air pollution. Pipeline infrastructure is in place prior to completions operations to ensure saleable gas, once hydrocarbons are cut, is sent directly to sales without flaring during flowback. false 90881490-3f47-4fbd-917c-663294d3a458 401130415 12 Interim Reclamation 604c.(2).K. Pit Level Indicators: All storage tanks used for active drilling operations (used in lieu of pits) contain pit level monitors with Electronic Drilling Recorders (EDR). KMG uses EDRs with pit level monitor(s) and alarm(s) for production rigs. Basic level gauges are used on tanks utilized for the surface rig. false cf7d4385-f6df-4926-8085-f5dc9dad913c 401130415 11 Drilling/Completion Operations 317.p Logging Program: One of the first wells drilled on the pad will be logged with Cased-hole Pulsed Neutron Log with Gamma Ray Log the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall clearly state “No open-hole logs were run” and shall reference the Rule 317.p Exception granted for the well. false cd16d326-280e-4b4d-9e40-b1fa00e01858 401130415 9 Drilling/Completion Operations Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. false 88432e22-390c-4ff6-a523-d0137c79683f 401130415 2 Drilling/Completion Operations 604c.(2).B. Closed Loop Drilling System: KMG will use a closed loop or “pitless” system for drilling and fluid management and will not construct a reserve pit. false 1722da5c-048c-4f05-b393-fe805ecbcd43 401130415 4 Drilling/Completion Operations 604c.(2).H. BOPE: Our rigs at a minimum will have a double ram with blind and pipe ram and annular preventer. false a495d388-525c-4847-b18e-14a186600ffe 401130415 5 Drilling/Completion Operations 604c.(2).I. BOPE Testing for Drilling Operations: BOPEs will be tested upon rig-up and, at a minimum, every 30 days. false 99bcb761-bc11-4d8e-bcbd-e57280d08cc6 401130415 8 Drilling/Completion Operations 803. Lighting: To the extent practicable, site lighting shall be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units. false 401130415 1ST 7 7 8 5 1 2 17 13669 1606 13669 0 PLANNED 401130415 CONDUCTOR 26 16 42.1 40 30 40 0 0 PLANNED 401130415 SURF 13 1 2 9 5 8 36 1500 590 1500 0 0 PLANNED 401130415 NIOBRARA NBRR 480 GWA Thread was being aborted.