<_x0034_00863321>
400863321 05 47120 KERR MCGEE OIL & GAS ONSHORE LP
P O BOX 173779
DENVER CO 80217-3779 Kayla Hesseltine 720 929-6552 Kayla Hesseltine Regulatory Specialist 2015-07-06T08:44:52.25-06:00 DRAFT KHESSELTINE 2015-07-06T08:44:52.25-06:00 KHESSELTINE kayla.hesseltine@anadarko.com 0.00000 kayla.hesseltine@anadarko.com IBEALE IBEALE 2015-09-21T13:52:51.187-06:00 400863321 05 123 41304 00 WELD BANE 27N2-9HZ SWSE 9 1N 65W 6 620 FSL WATTENBERG 462 1440 90750 FSL FEL 1484 FEL 2015-04-10T00:00:00-06:00 485 2015-06-20T00:00:00-06:00 FNL 2015-06-21T00:00:00-06:00 1484 OW FEL 11984 7177 11893 7177 4966 4991 CBL, GR, OHL 40.060447 -104.664736 2015-04-13T00:00:00-06:00 Carli Sloan 2.0 9 1N 65W 9 1N 65W Final Completion 2015-07-25T00:00:00-06:00 400863321 Due to anti-collision needs and the variability of directional drilling, our as-drilled BHL could be different than the permitted. This well is a conventional horizontal (monobore). Per rule 371.p Exception, open hole resistivity logs have been run on Bane 27N2-9HZ (05-123-41304) 400863321 400863323 PDF-MEASUREMENT/LOGGING WHILE DRILLING L 05123413040000_LWD_5MD_R1.pdf 1149146 400863321 400863325 LAS-MEASUREMENT/LOGGING WHILE DRILLING L 05123413040000_LWD_MEMORY_LAS_R1.las 481261 400863321 400863327 DIRECTIONAL DATA BANE 27N2-9HZ FINAL PRODUCTION.xlsm 34137 400863321 400863328 DIRECTIONAL SURVEY BANE 27N2-9HZ FINAL PLOT & SURVEY.pdf 192990 400863321 400863329 CEMENT JOB SUMMARY bane 27n2-9hz.pdf 844028 400863321 400895667 PDF-CEMENT BOND L 0512341304_Anadarko_Bane 27N2-9HZ_09-02-15_RBL.pdf 12825714 400863321 400898155 PDF-RESISTIVITY L 05123413040000_RESISTIVITY-GR_R1_1746-122031571.PDF 6519044 400863321 400898157 LAS-RESISTIVITY L 05123413040000_RESISTIVITY-GR_R1_1746-122031571.las 1686365 400863321 1ST 8 1 2 5 1 2 17 11980 1690 11980 0 0 CBL ACTUAL 400863321 CONDUCTOR 26 16 42.1 65 32 65 0 0 VISU ACTUAL 400863321 SURF 13 1 2 9 5 8 36 1595 641 1595 0 0 VISU ACTUAL 400863321 cement work 400863321 cement work Thread was being aborted.