<_x0034_00842154>
400842154 05 47120 KERR MCGEE OIL & GAS ONSHORE LP
P O BOX 173779
DENVER CO 80217-3779 Kayla Hesseltine 720 929-6552 Kayla Hesseltine Regulatory Specialist 2015-05-20T10:26:11.157-06:00 DRAFT KHESSELTINE 2015-05-20T10:26:11.157-06:00 KHESSELTINE kayla.hesseltine@anadarko.com 0.00000 kayla.hesseltine@anadarko.com KHESSELTINE KHESSELTINE 2015-08-18T07:51:54.483-06:00 400842154 05 123 36461 00 WELD BUFFALO 13N-15HZ NWNW 15 1N 68W 6 393 FNL WATTENBERG 662 953 90750 FNL FWL 773 FWL 2014-10-30T00:00:00-06:00 485 2015-05-12T00:00:00-06:00 FSL 2015-05-14T00:00:00-06:00 863 OW FWL 12295 7770 12196 7770 5139 5159 CBL, GR 40.057338 -104.995812 2014-11-14T00:00:00-07:00 Carli Sloan 2.0 15 1N 68W 15 1N 68W Final Completion 2015-06-22T00:00:00-06:00 400842154 Due to anti-collision needs and the variability of directional drilling, our as-drilled BHL could be different than the permitted. 400842154 400842154 FORM 5 SUBMITTED 400842154.pdf 400842154 400842162 DIRECTIONAL DATA BUFFALO 13N-15HZ FINAL PRODUCTION.xlsm 34173 400842154 400842164 DIRECTIONAL SURVEY BUFFALO 13N-15HZ FINAL PLOT & SURVEY.pdf 192704 400842154 400842165 CEMENT JOB SUMMARY buffalo 13n-15hz.pdf 1121198 400842154 400846600 LAS-MEASUREMENT/LOGGING WHILE DRILLING L 05123364610000_LWD_MD_1ft_LAS.las 510379 400842154 400846601 PDF-MEASUREMENT/LOGGING WHILE DRILLING L 05123364610000_LWD_MD_5in.pdf 1123601 400842154 400883920 PDF-CEMENT BOND L 0512336461_Anadarko_Buffalo 13N-15HZ_08-11-15_RBL.pdf 12351852 400842154 1ST 8 3 4 7 26 8150 790 8150 0 0 CBL ACTUAL 400842154 1ST LINER 6 1 8 4 1 2 11.6 12290 350 12290 7112 7112 CALC ACTUAL 400842154 SURF 13 1 2 9 5 8 36 1322 679 1322 0 0 VISU ACTUAL 400842154 cement work 400842154 cement work Thread was being aborted.