<_x0034_00504779>
400504779 05 100185 ENCANA OIL & GAS (USA) INC
370 17TH ST STE 1700
DENVER CO 80202-5632 Allison Linz 720 8763835 Allison Linz Permitting Analyst 2013-10-30T10:23:30.563-06:00 DRAFT linza 2013-10-30T10:23:30.563-06:00 linza allison.linz@encana.com 0.00000 allison.linz@encana.com linza linza 2013-10-30T10:32:16.39-06:00 400504779 05 045 15558 00 GARFIELD N. PARACHUTE EF05C-20 C29 59 NENW 29 5S 95W 6 651 FNL WILDCAT 0 2122 99999 FSL FWL 0 FWL 2008-11-09T00:00:00-07:00 332 2008-11-10T00:00:00-07:00 FSL 2008-11-11T00:00:00-07:00 1756 GW FWL 2829 2530 2809 2510 7010 7032 No Logs Submitted 39.590276 -108.079868 2010-09-24T00:00:00-06:00 Brandon Birdsall 2.7 29 5S 95W 20 5S 95W Final Completion 400504779 Surface casing for this well was preset due to Rig availability, they anticipated to resume drilling in 2010. 1/29/2009 Preliminary Form 5 filed with the Directional plan and Surface cement report, there were no logs run on this well. 8/2013 Development team ok'd approval to plug and abandon this well with surface casing. The BHL footages were calculated from the final directional report attached of TD of 2829'; surface casing set @ 2809' (PBTD). No Footages input for the Top of Production zone: does not apply to this well The plugging of this well is planned for the 2014 plugging season (to be plugged by 9/30/2014) Encana requests continued Shut In status for this surface csg, this well has been shut in since 11/11/2008. To insure that the well is closed to the atmosphere the surface casing it 400504779 400504779 FORM 5 SUBMITTED 400504779.pdf 400504779 400504793 CEMENT JOB SUMMARY EF05C-20 C29 595 Surface Cement Report.pdf 1494658 400504779 400504797 DIRECTIONAL SURVEY NP (C29 595 Pad) EF05C-20 Directional Survey Final (SH).pdf 91389 400504779 CONDUCTOR 30 20 55 172 500 172 0 0 CALC ACTUAL 400504779 SURF 12 1 4 9 5 8 36 2809 629 2829 0 0 CALC ACTUAL 400504779 cement work 400504779 cement work Thread was being aborted.