<_x0034_00503359>
400503359 05 100322 NOBLE ENERGY INC
1625 BROADWAY STE 2200
DENVER CO 80202 Julie Webb 720 587-2316 Julie Webb Regulatory Analyst 2013-10-28T12:34:15.25-06:00 DRAFT jwebb 2013-10-28T12:34:15.25-06:00 jwebb jwebb@nobleenergyinc.com 0.00000 jwebb@nobleenergyinc.com jwebb jwebb 2013-10-28T14:17:26.157-06:00 400503359 05 123 26192 00 WELD PEPPLER 24-32 NWSW 24 6N 64W 6 2145 FSL WATTENBERG 474 90750 FWL 2007-09-29T00:00:00-06:00 2007-10-02T00:00:00-06:00 2007-10-03T00:00:00-06:00 OW 7000 6941 4641 4653 CBL true Final Completion 400503359 400503359 FORM 5 SUBMITTED 400503359.pdf 400503359 400503407 PDF-CEMENT BOND L cbl noble peppler 24-32.pdf 2108501 400503359 400503536 CEMENT JOB SUMMARY Peppler 24-32 Cement Summary.pdf 1183295 400503359 1ST 7 7 8 4 1 2 0 6956 150 7000 5910 0 CBL ACTUAL 400503359 SURF 12 1 4 8 5 8 0 470 250 470 0 0 CALC ACTUAL 400503359 22938 S.C. 1.1 250 2330 4150 400503359 cement work 2013-09-11T00:00:00-06:00 400503359 cement work Control well w/ 20 bbls kill fluid. RIH w/ blade bit, and scraper, 220 jts. Tagged fill at 6788’ KB. TIH w/ RBP, retrieved head, 214 jts 2 3/8” tubing. Set RBP @ 6610’ KB w/ 216 jts. Spot 2sks of sand. Pressure test to 1500#. Roll hole. Unland casing. Pick Up mule shoe and TIH w/134 jts of 1 ¼“to 4255’. Test lines to 5000 psi. Pump 5bbl ahead. Pump 250 sks of “POZ” neat 13.5 ppg cement from 2330’ to 4150’. Reland casing. Test lines to 500#s. Bond log from 5000’ to surface. RIH w/ retrieving head and establish circulation and latch onto RBP. Roll hole clean and release RBP. Land 2 3/8” 4.7 # J-55 tubing to 6776’ KB. Rig down and move off. Thread was being aborted.