<_x0034_00410131>
400410131 06 100322 NOBLE ENERGY INC
1625 BROADWAY STE 2200
DENVER CO 80202 Leah Perkins 970 286-5925 970 304-5099 Julie Ottoson Base Production Tech 2013-04-26T12:13:35.98-06:00 DRAFT jottoson 2013-04-26T12:13:35.98-06:00 jottoson JOttoson@nobleenergyinc.com 0.00000 LPerkins@nobleenergyinc.com jottoson jottoson 2013-04-26T12:29:21.107-06:00 400410131 HICKEY, MIKE 970 302-1024 05 001 06790 00 CASE 1 NENE 17 1S 66W 6 ADAMS WATTENBERG 90750 N PRODUCTION Y 1000 N N 39.969599 -104.793380 2010-06-29T00:00:00-06:00 Paul Tappy 3.4 Will run a CBL as part of P&A procedure to determine cement tops and coverage. mike.hickey@state.co.us 400410131 DCP sales line developed a leak and production of impacted wells was not adequate to justify the repair. 400410131 400410131 FORM 6 INTENT SUBMITTED 400410131.pdf 400410131 400410141 WELLBORE DIAGRAM Case 01_Current Wellbore Config.pdf 166885 400410131 400410142 PROPOSED PLUGGING PROCEDURE Case 01_Proposed P&A Procedure.pdf 7664 400410131 400410143 WELLBORE DIAGRAM Case 01_Proposed Wellbore Config.pdf 13071 400410131 JSND 8104 7134 400410131 0 2 8004 false 400410131 1 false 400410131 2 CASING 20 2740 3000 false 400410131 3 STUB PLUG 100 800 1000 false 400410131 4 false 400410131 5 false 400410131 6 false 400410131 7 false 400410131 8 false 400410131 9 false 400410131 10 125 0 300 true 400410131 11 false 400410131 12 false 400410131 13 false 400410131 14 false 400410131 15 false 400410131 16 false 400410131 1ST 7 7 8 4 1 2 11.6 8237 250 8237 2400 CALC ACTUAL 400410131 S.C. 1.1 7 7 8 4 1 2 11.6 8237 250 1210 1150 CALC ACTUAL 400410131 SURF 12 1 4 8 5 8 24.0 113 110 113 0 VISU ACTUAL Thread was being aborted.