<_x0034_00088417>
400088417 02 2010-08-27T10:12:35.803-06:00 96850 WILLIAMS PRODUCTION RMT COMPANY
1515 ARAPAHOE ST STE 1000
DENVER CO 80202 Matt Barber 303 606-4385 303 629-8268 Matt Barber Sr. Regulatory Specialist 2010-08-27T10:12:35.803-06:00 2010-08-27T10:12:35.71-06:00 UPLOADED deel 2010-08-27T08:13:23.983-06:00 deel Matt.Barber@Williams.com 2.00000 335919 Matt.Barber@Williams.com In Process FreemanS FreemanS 2010-08-30T10:58:46.957-06:00 400088417 DR Y N GAS MULTIPLE N Federal RGU 432-1-298 Ryan Gulch Unit COC068239X 12407 Lot 21 1 2s 98w 6 572 Sulphur Creek FEL 803 80090 6576 FNL RIO BLANCO DIRECTIONAL 1830 1830 FEL FEDERAL 1804 FNL COC060736 1 FEDERAL Y 2s 98w 975 T2S, R98W: Sec 1: Lots 22-27, 30-35; Sec 2: Lots 14, 21-35; N FEL 1804 1804 4075 FNL FEET 1 746 2s 1487 98w FEET FEET FEET N N N ONSITE Evaporation & Backfilling 05 103 11437 00 ANNULAR PREVENTOR DOUBLE RAM 39.910260 -108.335159 2010-08-04T00:00:00-06:00 John Richardson 2.5 Y true true 400088417 Cement will be circulated to the surface in the conductor string. Cement will be circulated to 200’ above the uppermost mesaverde sand in the production string. This is a new drilling location. 400088417 400088417 FORM 2 SUBMITTED 400088417.pdf 400088417 400088418 WELL LOCATION PLAT 01_RGU 432-1-298_CWP.pdf 91153 400088417 400088419 TOPO MAP 02_RGU 41-1-298_topo map.pdf 385388 400088417 400088420 DEVIATED DRILLING PLAN 03_RGU 432-1-298_Dev Drilling Plan.pdf 127598 400088417 400088421 FED. DRILLING PERMIT 04_RGU 432-1-298_BLM APD.pdf 427922 400088417 400088142 02A 2A submitted with APD 400088417 3RD 8 3 4 4 1 2 11.6# 12407 12407 PLANNED 400088417 CONDUCTOR 26 18 48# 80 135 80 PLANNED 400088417 SURF 14 3 4 9 5 8 36# 3585 3585 PLANNED 400088417 Iles ILES 400088417 Sego SEGO 400088417 Williams Fork WMFK
Thread was being aborted.