|
|
|
|
|
Wellbore #00 Status: PA - 11/30/2021 Measured TD: 8638 ft. Vertical TD: 8410 ft. Wellbore Data for the original wellbore | PA - 11/30/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20051858 | Expiration Date: | 6/27/2006 | Prop Depth/Form: | 8639 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5775 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 350, Top: 4300 ft., Bottom: 5775 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 7/8/2005 | Spud Date Is: | ACTUAL | Measured TD: | 8638 ft. | Measured PB depth: | 8595 ft. | True Vertical TD: | 8410 ft. | True Vertical PB depth: | 8367 ft. | Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 659 FNL 1975 FWL | Depth | Bottom Hole Location: | Sec:20 Twp: 1N 67W | Footage: 659 FSL 1975 FWL | Depth | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 934 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 555, Top: 0 ft., Bottom: 934 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8630 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 7086 ft., Bottom: 8630 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7651 ft. | | N | N | FORT HAYS | 8058 ft. | | N | N | CODELL | 8078 ft. | | N | N | MOWRY | 8495 ft. | | N | N | J SAND | 8635 ft. | | N | N |
Formation JSND Status: AB - 11/30/2021 Interval Top: 8524 ft. Interval Bottom: 8546 ft. Completed information for formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/16/2006 | Treatment Summary: | FRAC J SAND (8524'-8546') WITH 212,200 GAL FRAC FLUID CONTAINING 288,280# 20/40 WHITE SAND AND 12,000# SANTROL SUPER LC RCS. 7/24/05 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8510 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8524 ft. | # Of Holes: | 44 | Interval Bottom: | 8546 ft. | Hole Size: | 0.45 in. |
|
Formation JNBCD Status: CM - 1/16/2006 Interval Top: 7650 ft. Interval Bottom: 8546 ft. Completed information for formation J-NIOBRARA-CODELL | 1st Production Date: | 1/13/2006 | Choke Size: | 0.281 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/8/2006 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CIBP @ 7950' AND 8200' TO COMMINGLE THE JSND-NBRR-CDL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8516 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/16/2006 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 153 | BBLS_OIL | 79 | CALC_BBLS_H2O | 153 | CALC_BBLS_OIL | 79 | CALC_GOR | 5241 | CALC_MCF_GAS | 414 | CASING_PRESS | 1258 | MCF_GAS | 414 | TUBING_PRESS | 463 |
| Perforation Data: | Interval Top: | 7650 ft. | # Of Holes: | 284 | Interval Bottom: | 8546 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Status: AB - 11/30/2021 Interval Top: 7650 ft. Interval Bottom: 8096 ft. Completed information for formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.188 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/26/2005 | Treatment Summary: | SET CBP @ 8200'. 8/24/05. FRAC'D THE CODELL (8080'-8096') WITH 135928 GAL FRAC FLUID AND 300,120# SAND. 8/31/05. SET CBP @ 7950'. FRAC'D THE NIOBRARA (7650'-7674', 7828'-7848') WITH 168,658 GAL FRAC FLUID AND 300,600# SAND. 11/18/05 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/26/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 240 | BBLS_OIL | 94 | CASING_PRESS | 928 | MCF_GAS | 245 |
| Perforation Data: | Interval Top: | 7650 ft. | # Of Holes: | 240 | Interval Bottom: | 8096 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|