COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-50515                               Status: PR         3/1/2021
Well Name/No: MAE J #8-6HZ (click well name for production)
Operator: KERR MCGEE OIL & GAS ONSHORE LP - 47120
Status Date: 3/1/2021 Federal or State Lease #:
FacilityID: 467444 LocationID: 466612
County: WELD #123 Location: SESW  8 1N68W 6 PM
Field: WATTENBERG  - #90750 Elevation: 5,082 ft.
Planned Location       821 FSL  2416 FWL Lat/Long: 40.060505/-105.028601 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         2/28/2021
Job End Date:  3/5/2021
Reported:   4/14/2021
 
Days to report:  40
 
Wellbore Data for Sidetrack #00                                                    Status: PR         3/1/2021
Spud Date: 10/5/2019 Spud Date is: NOTICE
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 9/11/2021 10:36:24 AM
Prop Depth/Form: 13226 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 36.94
Cement: Sacks: 64, Top: 0, Bottom: 80, Determination Method:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36
Cement: Sacks: 590, Top: 0, Bottom: 1500, Determination Method:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 13216, Weight: 17
Cement: Sacks: 1550, Top: , Bottom: 13216, Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 17 Twp: 1N 68W Footage: 50 N  2617 E Depth
Bottom Hole Location:   Sec: 17 Twp: 1N 68W Footages: 50 FSL  2568 FEL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         3/1/2021
1st Production Date: 10/1/2019 Choke Size:
Status Date: 3/1/2021 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .