COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-50294                               Status: PR         11/6/2019
Well Name/No: Judy #3-4 (click well name for production)
Operator: CONFLUENCE DJ LLC - 10518
Status Date: 11/6/2019 Federal or State Lease #:
FacilityID: 466143 LocationID: 449244
County: WELD #123 Location: SWSW  34 1N65W 6 PM
Field: WATTENBERG  - #90750 Elevation: 5,139 ft.
Planned Location       620 FSL  743 FWL Lat/Long: 40.00225/-104.6569 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         9/26/2019
Job End Date:  9/26/2019
Reported:   11/5/2019
 
Days to report:  40
 
Wellbore Data for Sidetrack #00                                                    Status: PR         11/6/2019
Spud Date: 9/6/2019 Spud Date is: NOTICE
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 7/22/2021 11:01:01 AM
Prop Depth/Form: 7699 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NW/4
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 43
Cement: Sacks: 400, Top: 0, Bottom: 80, Method Grade:
Casing: String Type: SURF , Hole Size: 8.75, Size: 7, Top: 0, Depth: 1500, Weight: 26
Cement: Sacks: 446, Top: 0, Bottom: 1500, Method Grade:
Casing: String Type: 1ST , Hole Size: 6.25, Size: 4.5, Top: 0, Depth: 7699, Weight: 11.6
Cement: Sacks: 310, Top: , Bottom: 7699, Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 3 Twp: 1S 65W Footage: 470 N  580 W Depth
Bottom Hole Location:   Sec: 3 Twp: 1S 65W Footages: 470 FNL  580 FWL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation CODL                                     Status: CM         12/16/2019
1st Production Date: 11/7/2019 Choke Size:
Status Date: 12/16/2019 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 9/24/2019 Treatment End Date: 9/26/2019
Treatment summary: Frac Codell w/ 5,381 bbls Slickwater (clean), 5,717 bbls Slurry, & 249,940 lbs 30/50 Sand. 48 perforations from 7,612'-7,624'.
Total fluid used in treatment (bbls): 5381 Max pressure during treatment (psi): 6146
Total gas used in treatment (mcf): Fluid density (lbs/gal): 8.33
Type of gas: Number of staged intervals: 1
Total acid used in treatment (bbls): Min frac gradient (psi/ft): 0.8
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): 5381 Disposition method for flowback: DISPOSAL
Total proppant used (lbs): 249940 Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CODL .
    Perforation Data:
    Interval Bottom: 7624 Interval Top: 7612
    # of Holes: 48 Hole Size: 0.34
Completed information for formation N-COM                                     Status: PR         10/1/2019
1st Production Date: 9/1/2019 Choke Size:
Status Date: 10/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .
Completed information for formation NB-CD                                     Status: PR         11/6/2019
1st Production Date: 10/30/2019 Choke Size:
Status Date: 11/6/2019 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA-CODELL Status: PR
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 9/26/2019 Treatment End Date: 9/26/2019
Treatment summary: Performed 2 Stage Frac. Total Fluid Used: 11,084 bbls. Total Proppant Used: 514,280 lbs. Max Pressure 6,146 psi. Total Acid Used: 24 bbl 15% HCl. Perforations from 7,430'-7,442' (24 holes, 0.7" Diameter), 7,495'-7,507' (24 holes, 0.7" Diameter) w/ 5,703 bbls Slickwater & 264,340 lbs 30/50 Sand. Perforations from 7,612'-7,624' (48 holes, 0.34" Diameter), w/ 5,381 bbls Slickwater & 249,940 lbs 30/50 Sand.
Total fluid used in treatment (bbls): 11108 Max pressure during treatment (psi): 6146
Total gas used in treatment (mcf): Fluid density (lbs/gal): 8.33
Type of gas: Number of staged intervals: 2
Total acid used in treatment (bbls): 24 Min frac gradient (psi/ft): 0.8
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls): 2629
Produced water used in treatment (bbls): 11084 Disposition method for flowback: DISPOSAL
Total proppant used (lbs): 514280 Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: 2.375 Tubing Setting Depth: 7433
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 11/6/2019 Test Method: SWAB
Hours Tested: 24 Gas Type: WET
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 12    
    BBLS_OIL 14    
    BTU_GAS 1306    
    CALC_BBLS_H2O 12    
    CALC_BBLS_OIL 14    
    CALC_GOR 357    
    CALC_MCF_GAS 5    
    CASING_PRESS 507    
    GRAVITY_OIL 36    
    MCF_GAS 5    
    Perforation Data:
    Interval Bottom: 7624 Interval Top: 7430
    # of Holes: 96 Hole Size: 0.7
Completed information for formation NBRR                                     Status: CM         12/16/2019
1st Production Date: 11/7/2019 Choke Size:
Status Date: 12/16/2019 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA Status: CM
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 9/26/2019 Treatment End Date: 9/26/2019
Treatment summary: Frac Nio w/ 5,703 bbls Slickwater (clean), 6,042 bbls Slurry, & 264,340 lbs 30/50 Sand. Perforations from 7,430'-7,442' (24 holes) and 7,495'-7,507' (24 holes).
Total fluid used in treatment (bbls): 5703 Max pressure during treatment (psi): 5323
Total gas used in treatment (mcf): Fluid density (lbs/gal): 8.33
Type of gas: Number of staged intervals: 1
Total acid used in treatment (bbls): Min frac gradient (psi/ft): 0.8
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): 5703 Disposition method for flowback: DISPOSAL
Total proppant used (lbs): 264340 Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation NBRR .
    Perforation Data:
    Interval Bottom: 7507 Interval Top: 7430
    # of Holes: 48 Hole Size: 0.7