COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-48665                               Status: DG         11/21/2019
Well Name/No: Guttersen State #DD30-725 (click well name for production)
Operator: NOBLE ENERGY INC - 100322
Status Date: 11/21/2019 Federal or State Lease #: OG-110849
FacilityID: 459034 LocationID: 459035
County: WELD #123 Location: SESE  30 3N63W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,823 ft.
Planned Location       481 FSL  854 FEL Lat/Long: 40.19046/-104.47416 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         2/28/2020
Job End Date:  3/18/2020
Reported:   4/20/2020
 
Days to report:  33
 
Wellbore Data for Sidetrack #00                                                    Status: DG         11/21/2019
Spud Date: 11/21/2019 Spud Date is: NOTICE
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 10/28/2024
Prop Depth/Form: 16994 Surface Mineral Owner Same:
Mineral Owner: STATE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: 407-2624 , Unit Acreage: 1280, Drill Unit: 19&30: All
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 42
Cement: Sacks: 173, Top: 0, Bottom: 80, Determination Method:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1850, Weight: 36
Cement: Sacks: 658, Top: 0, Bottom: 1850, Determination Method:
Casing: String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 16994, Weight: 17
Cement: Sacks: 1863, Top: , Bottom: 16994, Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 30 Twp: 3N 63W Footage: 500 S  990 E Depth
Bottom Hole Location:   Sec: 19 Twp: 3N 63W Footages: 200 FNL  990 FEL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: WO         12/1/2019
1st Production Date: 12/1/2019 Choke Size:
Status Date: 12/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: WO
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .