COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-47307                               Status: PR         6/1/2019
Well Name/No: Critter Creek #16-5906D (click well name for production)
Operator: HIGHPOINT OPERATING CORPORATION - 10071
Status Date: 6/1/2019 Federal or State Lease #: CO 8725.5
FacilityID: 455966 LocationID: 414451
County: WELD #123 Location: SESE  16 11N63W 6 PM
Field: HEREFORD  - #34200 Elevation: 5,253 ft.
Planned Location       430 FSL  1049 FEL Lat/Long: 40.916289/-104.43226 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         4/10/2019
Job End Date:  4/26/2019
Reported:   7/23/2019
 
Days to report:  88
 
Wellbore Data for Sidetrack #00                                                    Status: XX         6/1/2019
Spud Date: 8/16/2018 Spud Date is: NOTICE
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 7/11/2020 3:09:53 PM
Prop Depth/Form: 18124 Surface Mineral Owner Same:
Mineral Owner: STATE Surface Owner: STATE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: 421-79 , Unit Acreage: 1280, Drill Unit: Sec 9 & Sec 16: All
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36
Cement: Sacks: 730, Top: 0, Bottom: 1500, Determination Method:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 7, Top: 0, Depth: 8103, Weight: 23
Cement: Sacks: 789, Top: 1300, Bottom: 8103, Determination Method:
Casing: String Type: 1ST LINER , Hole Size: 6.125, Size: 4.5, Top: 7203, Depth: 18124, Weight: 11.6
Cement: Sacks: 555, Top: 7203, Bottom: 18124, Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 16 Twp: 11N 63W Footage: 300 S  1935 E Depth
Bottom Hole Location:   Sec: 9 Twp: 11N 63W Footages: 240 FNL  1925 FEL Depth
Formation Log Top Log Bottom Cored DSTs
No additional interval records were found for sidetrack 00.
Wellbore Data for Sidetrack #01                                                    Status: PR         8/1/2019
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 12/5/2020 4:14:37 PM
Prop Depth/Form: 18124 Surface Mineral Owner Same:
Mineral Owner: STATE Surface Owner: STATE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: 421-79 , Unit Acreage: 1280, Drill Unit: Sec 9 & Sec 16: All
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1544, Weight: 36
Cement: Sacks: 413, Top: 0, Bottom: 1544, Determination Method:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 7, Top: 0, Depth: 8116, Weight: 23
Cement: Sacks: 790, Top: 1300, Bottom: 8116, Determination Method:
Casing: String Type: 1ST LINER , Hole Size: 6.125, Size: 4.5, Top: 7203, Depth: 18124, Weight: 11.6
Cement: Sacks: 555, Top: 7203, Bottom: 18119, Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 16 Twp: 11N 63W Footage: 300 S  1935 E Depth
Bottom Hole Location:   Sec: 9 Twp: 11N 63W Footages: 240 FNL  1925 FEL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         8/1/2019
1st Production Date: 8/1/2019 Choke Size:
Status Date: 8/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .
Completed information for formation N-COM1                                     Status: PR         4/1/2020
1st Production Date: 11/1/2018 Choke Size:
Status Date: 4/1/2020 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM1.
No Perforation Data was found for formation N-COM1.
Completed information for formation N-COM2                                     Status: PR         4/1/2020
1st Production Date: 11/1/2018 Choke Size:
Status Date: 4/1/2020 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM2.
No Perforation Data was found for formation N-COM2.