COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-45502                               Status: PR         5/12/2021
Well Name/No: PAPA JO 2-25 #35C-17HZ (click well name for production)
Operator: KERR MCGEE OIL & GAS ONSHORE LP - 47120
Status Date: 5/12/2021 3:45:58 PM Federal or State Lease #:
FacilityID: 452268 LocationID: 452217
County: WELD #123 Location: NWSW  8 1N68W 6 PM
Field: DJ HORIZONTAL CODELL  - #16948 Elevation: 5,065 ft.
Planned Location       1405 FSL  1204 FWL Lat/Long: 40.062071/-105.033034 Lat/Long Source: Field Measured
As Drilled Location      Footages Not Available Lat/Long: 40.062069/-105.033035 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         3/27/2021
Job End Date:  3/30/2021
Reported:   5/17/2021
 
Days to report:  48
 
Wellbore Data for Sidetrack #00                                                    Status: PR         5/12/2021
Spud Date: 11/17/2017 Spud Date is: ACTUAL
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 9/20/2019 9:43:34 AM
Prop Depth/Form: 13462 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 40, Weight: 42.1
Cement: Sacks: 30, Top: 0, Bottom: 40, Determination Method:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36
Cement: Sacks: 590, Top: 0, Bottom: 1500, Determination Method:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 13452, Weight: 17
Cement: Sacks: 1579, Top: , Bottom: 13452, Determination Method:
Wellbore Completed
Completion Date: 1/30/2018
Measured TD: 13504 Measured PB depth: 13490
True Vertical TD: 7836 True Vertical PB depth: 7837
Top PZ Location:           Sec: 17 Twp: 1N 68W Footage: 41 N  1018 W Depth
Bottom Hole Location:   Sec: 17 Twp: 1N 68W Footages: 51 FSL  1008 FWL Depth
Log Types: GR, CBL, CNL
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 106, Weight: 42
Cement: Sacks: 64, Top: 0, Bottom: 106, Determination Method: VISU
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1865, Weight: 36
Cement: Sacks: 703, Top: 0, Bottom: 1875, Determination Method: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 13494, Weight: 17
Cement: Sacks: 1290, Top: 1040, Bottom: 13504, Determination Method: CBL
Formation Log Top Log Bottom Cored DSTs
PARKMAN 4268
SUSSEX 4708
SHANNON 5232
SHARON SPRINGS 7553
NIOBRARA 7605
FORT HAYS 8250
CODELL 8704
CARLILE 10749
Completed information for formation CARL                                     Status: CM         12/10/2021
1st Production Date: N/A Choke Size:
Status Date: 12/10/2021 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CARLILE Status: CM
Formation Treatment Treatment Type: HYDRAULIC FRACTURING
Treatment Date: 12/10/2021 Treatment End Date: N/A
Treatment summary: 10749-11529
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CARL .
    Perforation Data:
    Interval Bottom: 11529 Interval Top: 10749
    # of Holes: 300 Hole Size: 0.44
Completed information for formation CLCDFH                                     Status: PR         5/12/2021
1st Production Date: 4/20/2021 Choke Size:
Status Date: 5/12/2021 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: CARLILE-CODELL-FORT HAYS Status: PR
Formation Treatment Treatment Type: HYDRAULIC FRACTURING
Treatment Date: 3/27/2021 Treatment End Date: 3/30/2021
Treatment summary: PERF FROM 8337-13466 2,574 BBLS PUMP DOWN; 128,814 BBLS SLICKWATER; 131,388 BBLS TOTAL FLUID. 2,037,014 LBS WHITE 30/50 OTTAWA/ST. PETERS; 797,287 LBS WHITE 40/70 OTTAWA/ST. PETERS; 2,834,301 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls): 131388 Max pressure during treatment (psi): 8039
Total gas used in treatment (mcf): 0 Fluid density (lbs/gal): 8.3
Type of gas: Number of staged intervals: 13
Total acid used in treatment (bbls): 0 Min frac gradient (psi/ft): 0.84
Recycled water used in treatment (bbls): 0 Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): 131388 Disposition method for flowback: DISPOSAL
Total proppant used (lbs): 2834301 Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: 2.375 Tubing Setting Depth: 7830
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 5/12/2021 Test Method: Flowing
Hours Tested: 24 Gas Type: WET
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 214    
    BBLS_OIL 73    
    BTU_GAS 1258    
    CALC_BBLS_H2O 214    
    CALC_BBLS_OIL 73    
    CALC_GOR 2548    
    CALC_MCF_GAS 186    
    CASING_PRESS 2400    
    GRAVITY_OIL 49    
    MCF_GAS 186    
    TUBING_PRESS 1700    
    Perforation Data:
    Interval Bottom: 13466 Interval Top: 8337
    # of Holes: 300 Hole Size: 0.44
Completed information for formation CODL                                     Status: CM         12/10/2021
1st Production Date: N/A Choke Size:
Status Date: 12/10/2021 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment Treatment Type: HYDRAULIC FRACTURING
Treatment Date: 12/10/2021 Treatment End Date: N/A
Treatment summary: 8681-10418, 11529-13466
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CODL .
    Perforation Data:
    Interval Bottom: 13466 Interval Top: 8681
    # of Holes: 300 Hole Size: 0.44
Completed information for formation FTHYS                                     Status: CM         12/10/2021
1st Production Date: N/A Choke Size:
Status Date: 12/10/2021 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: FORT HAYS Status: CM
Formation Treatment Treatment Type: HYDRAULIC FRACTURING
Treatment Date: 12/10/2021 Treatment End Date: N/A
Treatment summary: 8337-8681, 10418-10749
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation FTHYS .
    Perforation Data:
    Interval Bottom: 10749 Interval Top: 8337
    # of Holes: 300 Hole Size: 0.44