COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-123-44422 Status: PR 10/24/2019 | ||||||||||
Well Name/No: | VT-LDS #C2-16-18 | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 10/24/2019 | Federal or State Lease #: | ||||||||
FacilityID: | 449628 | LocationID: | 322888 | |||||||
County: | WELD #123 | Location: | SWNW 15 5N65W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 4,647 ft. | |||||||
Planned Location 1886 FNL 626 FWL | Lat/Long: 40.40131/-104.65663 | Lat/Long Source: Field Measured | ||||||||
As Drilled Location Footages Not Available | Lat/Long: 40.401312/-104.656631 | Lat/Long Source: Field Measured | ||||||||
Job Date: 5/27/2019 Job End Date: 6/5/2019 |
Reported:
7/15/2019 |
Days to report: 40 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 10/24/2019 | ||||||||||
Spud Date: | 5/23/2018 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 3/10/2019 11:51:44 AM | ||||||
Prop Depth/Form: | 20659 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 20659, Weight: 20 | |||||||||
Cement: | Sacks: 1976, Top: 1500, Bottom: 20659, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 6/27/2018 | |||||||||
Measured TD: | 20580 | Measured PB depth: | 20570 | |||||||
True Vertical TD: | 7026 | True Vertical PB depth: | 7026 | |||||||
Top PZ Location: Sec: 16 Twp: 5N 65W | Footage: 909 N 2146 W | Depth | ||||||||
Bottom Hole Location: Sec: 18 Twp: 5N 65W | Footages: 822 FNL 495 FWL | Depth | ||||||||
Log Types: | CBL, Mud Log, MWD/LWD, Triple Combination. | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1552, Weight: 36 | |||||||||
Cement: | Sacks: 675, Top: 0, Bottom: 1553, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 20575, Weight: 20 | |||||||||
Cement: | Sacks: 3280, Top: 166, Bottom: 20580, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 3955 | N | N | |||||||
SUSSEX | 4536 | N | N | |||||||
SHARON SPRINGS | 7660 | N | N | |||||||
NIOBRARA | 7749 | N | N | |||||||
FORT HAYS | 8237 | N | N | |||||||
CODELL | 8345 | N | N | |||||||
Completed information for formation CODL Status: CM 11/25/2019 | ||||||||||
1st Production Date: | 10/14/2019 | Choke Size: | ||||||||
Status Date: | 11/25/2019 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CODELL | Status: | CM | |||||||
Formation Treatment | Treatment Type: | FRACTURE STIMULATION | ||||||||
Treatment Date: | 5/27/2019 | Treatment End Date: | 6/5/2019 | |||||||
Treatment summary: Perforated Intervals: 8371'-16586'; 17669'-20525'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CODL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 20525 | Interval Top: | 8371 | |||||||
# of Holes: | 1315 | Hole Size: | 0.38 | |||||||
Completed information for formation FTHYS Status: CM 11/25/2019 | ||||||||||
1st Production Date: | 10/14/2019 | Choke Size: | ||||||||
Status Date: | 11/25/2019 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | FORT HAYS | Status: | CM | |||||||
Formation Treatment | Treatment Type: | FRACTURE STIMULATION | ||||||||
Treatment Date: | 5/27/2019 | Treatment End Date: | 6/5/2019 | |||||||
Treatment summary: Perfoated Interval: 16609'-16971'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation FTHYS . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 16971 | Interval Top: | 16609 | |||||||
# of Holes: | 45 | Hole Size: | 0.38 | |||||||
Completed information for formation NBFHC Status: PR 10/24/2019 | ||||||||||
1st Production Date: | 10/14/2019 | Choke Size: | ||||||||
Status Date: | 10/24/2019 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | NIOBRARA-FT HAYS-CODELL | Status: | PR | |||||||
Formation Treatment | Treatment Type: | FRACTURE STIMULATION | ||||||||
Treatment Date: | 5/27/2019 | Treatment End Date: | 6/5/2019 | |||||||
Treatment summary: Frac'd Niobrara-Fort Hays-Codell with 49-stage plug-and-perf; 133101 total bbls fluid pumped: 114036 bbls gelled fluid and 19065 bbls fresh water; 9800035 total lbs proppant pumped: 409200 lbs 40/70 mesh and 9390835 lbs 30/50 mesh. | ||||||||||
Total fluid used in treatment (bbls): | 133101 | Max pressure during treatment (psi): | 9283 | |||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | 8.33 | ||||||||
Type of gas: | Number of staged intervals: | 49 | ||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | 0.96 | ||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | 13604 | ||||||||
Produced water used in treatment (bbls): | 19065 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 9800035 | Green completions techniques utilized: | True | |||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 8249 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 10/24/2019 | Test Method: | flowing | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 98 | |||||||||
BBLS_OIL | 515 | |||||||||
BTU_GAS | 1280 | |||||||||
CALC_BBLS_H2O | 98 | |||||||||
CALC_BBLS_OIL | 515 | |||||||||
CALC_GOR | 7062 | |||||||||
CALC_MCF_GAS | 3637 | |||||||||
CASING_PRESS | 3161 | |||||||||
GRAVITY_OIL | 51 | |||||||||
MCF_GAS | 3637 | |||||||||
TUBING_PRESS | 2809 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 20525 | Interval Top: | 8371 | |||||||
# of Holes: | 1441 | Hole Size: | 0.38 | |||||||
Completed information for formation NBRR Status: CM 11/25/2019 | ||||||||||
1st Production Date: | 10/14/2019 | Choke Size: | ||||||||
Status Date: | 11/25/2019 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | NIOBRARA | Status: | CM | |||||||
Formation Treatment | Treatment Type: | FRACTURE STIMULATION | ||||||||
Treatment Date: | 5/27/2019 | Treatment End Date: | 6/5/2019 | |||||||
Treatment summary: Perforated Interval: 16994'-17646'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation NBRR . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 17646 | Interval Top: | 16994 | |||||||
# of Holes: | 81 | Hole Size: | 0.38 |