COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-123-44418 Status: PR 10/25/2019 | ||||||||||
Well Name/No: | VT-LDS #C3-16-18 | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 10/25/2019 | Federal or State Lease #: | ||||||||
FacilityID: | 449624 | LocationID: | 322888 | |||||||
County: | WELD #123 | Location: | SWNW 15 5N65W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 4,648 ft. | |||||||
Planned Location 1895 FNL 554 FWL | Lat/Long: 40.40129/-104.65689 | Lat/Long Source: Field Measured | ||||||||
As Drilled Location Footages Not Available | Lat/Long: 40.401285/-104.656888 | Lat/Long Source: Field Measured | ||||||||
Job Date: 6/6/2019 Job End Date: 6/16/2019 |
Reported:
7/15/2019 |
Days to report: 29 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 10/25/2019 | ||||||||||
Spud Date: | 5/26/2018 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 3/10/2019 11:42:03 AM | ||||||
Prop Depth/Form: | 20510 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA | |||||||||
Formation and Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 20510, Weight: 20 | |||||||||
Cement: | Sacks: 1961, Top: 1500, Bottom: 20510, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 7/13/2018 | |||||||||
Measured TD: | 20340 | Measured PB depth: | 20326 | |||||||
True Vertical TD: | 6947 | True Vertical PB depth: | 6947 | |||||||
Top PZ Location: Sec: 16 Twp: 5N 65W | Footage: 1587 N 2142 W | Depth | ||||||||
Bottom Hole Location: Sec: 18 Twp: 5N 65W | Footages: 1531 FNL 509 FWL | Depth | ||||||||
Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 123-44422). | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1609, Weight: 36 | |||||||||
Cement: | Sacks: 675, Top: 0, Bottom: 1609, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 20330, Weight: 20 | |||||||||
Cement: | Sacks: 3260, Top: 71, Bottom: 20340, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 3966 | N | N | |||||||
SUSSEX | 4531 | N | N | |||||||
SHARON SPRINGS | 7580 | N | N | |||||||
NIOBRARA | 7682 | N | N | |||||||
Completed information for formation NBRR Status: PR 10/25/2019 | ||||||||||
1st Production Date: | 10/15/2019 | Choke Size: | ||||||||
Status Date: | 10/25/2019 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | NIOBRARA | Status: | PR | |||||||
Formation Treatment | Treatment Type: | FRACTURE STIMULATION | ||||||||
Treatment Date: | 6/6/2019 | Treatment End Date: | 6/16/2019 | |||||||
Treatment summary: Frac'd Niobrara with 61-stage plug-and-perf; 148717 total bbls fluid pumped: 121202 bbls gelled fluid and 27515 bbls fresh water; 12200046 total lbs proppant pumped: 7970021 lbs 40/70 mesh and 4230025 lbs 30/50 mesh. | ||||||||||
Total fluid used in treatment (bbls): | 148717 | Max pressure during treatment (psi): | 8919 | |||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | 8.33 | ||||||||
Type of gas: | Number of staged intervals: | 61 | ||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | 1.02 | ||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | 15184 | ||||||||
Produced water used in treatment (bbls): | 27515 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 12200046 | Green completions techniques utilized: | True | |||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 8006 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 10/25/2019 | Test Method: | FLOWING | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 146 | |||||||||
BBLS_OIL | 516 | |||||||||
BTU_GAS | 1280 | |||||||||
CALC_BBLS_H2O | 146 | |||||||||
CALC_BBLS_OIL | 516 | |||||||||
CALC_GOR | 3535 | |||||||||
CALC_MCF_GAS | 1824 | |||||||||
CASING_PRESS | 3053 | |||||||||
GRAVITY_OIL | 51 | |||||||||
MCF_GAS | 1824 | |||||||||
TUBING_PRESS | 2743 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 20277 | Interval Top: | 8154 | |||||||
# of Holes: | 1441 | Hole Size: | 0.4 |