COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-43760                               Status: PR         9/4/2019
Well Name/No: SHARON #21-5HZ (click well name for production)
Operator: KERR MCGEE OIL & GAS ONSHORE LP - 47120
Status Date: 9/4/2019 Federal or State Lease #:
FacilityID: 448104 LocationID: 448107
County: WELD #123 Location: NESW  21 4N67W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,938 ft.
Planned Location       2298 FSL  2206 FWL Lat/Long: 40.297416/-104.8976 Lat/Long Source: Field Measured
As Drilled Location      Footages Not Available Lat/Long: 40.297416/-104.8976 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         7/13/2019
Job End Date:  7/22/2019
Reported:   9/10/2019
 
Days to report:  50
 
Wellbore Data for Sidetrack #00                                                    Status: PR         9/4/2019
Spud Date: 8/28/2018 Spud Date is: ACTUAL
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 7/24/2020 8:00:09 AM
Prop Depth/Form: 18139 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA
Formation and Spacing: Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 36.94
Cement: Sacks: 64, Top: 0, Bottom: 80, Determination Method:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36
Cement: Sacks: 590, Top: 0, Bottom: 1500, Determination Method:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 18129, Weight: 17
Cement: Sacks: 2151, Top: , Bottom: 18129, Determination Method:
Wellbore Completed
Completion Date: 10/12/2018
Measured TD: 18104 Measured PB depth: 18090
True Vertical TD: 7295 True Vertical PB depth: 7294
Top PZ Location:           Sec: 21 Twp: 4N 67W Footage: 1207 N  2402 W Depth
Bottom Hole Location:   Sec: 19 Twp: 4N 67W Footages: 1424 FNL  2384 FEL Depth
Log Types: CBL, MWD/LWD. (GR/RES in API 123-43762).
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 97, Weight: 42
Cement: Sacks: 64, Top: 0, Bottom: 97, Determination Method: VISU
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1848, Weight: 36
Cement: Sacks: 692, Top: 0, Bottom: 1848, Determination Method: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 18094, Weight: 17
Cement: Sacks: 1740, Top: 1715, Bottom: 18104, Determination Method: CBL
Formation Log Top Log Bottom Cored DSTs
FOX HILLS 876
PARKMAN 3957
SUSSEX 4444
SHARON SPRINGS 7300
NIOBRARA 7344
FORT HAYS 7841
CODELL 7929
CARLILE 11511
Completed information for formation CARL                                     Status: CM         9/12/2019
1st Production Date: N/A Choke Size:
Status Date: 9/12/2019 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CARLILE Status: CM
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 9/12/2019 Treatment End Date: N/A
Treatment summary: 11511-11938, 12390-12623
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CARL .
    Perforation Data:
    Interval Bottom: 12623 Interval Top: 11511
    # of Holes: 600 Hole Size: 0.44
Completed information for formation CLCDFH                                     Status: PR         9/4/2019
1st Production Date: 8/7/2019 Choke Size:
Status Date: 9/4/2019 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: CARLILE-CODELL-FORT HAYS Status: PR
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 7/13/2019 Treatment End Date: 7/22/2019
Treatment summary: PERF FROM 8429-18070 48 BBLS 15% HCL ACID, 228 BBLS 7.5% HCL ACID, 9,038 BBLS PUMP DOWN, 174,719 BBLS SLICKWATER, 184,033 BBLS TOTAL FLUID. 5,314,850 BBLS WHITE 40/70 OTTAWA/ST. PETERS, 5,314,850 BBLS TOTAL PROPPANT.
Total fluid used in treatment (bbls): 184033 Max pressure during treatment (psi): 7757
Total gas used in treatment (mcf): 0 Fluid density (lbs/gal): 8.3
Type of gas: Number of staged intervals: 25
Total acid used in treatment (bbls): 276 Min frac gradient (psi/ft): 0.81
Recycled water used in treatment (bbls): 860 Total flowback volume recovered (bbls): 11508
Produced water used in treatment (bbls): 182897 Disposition method for flowback: RECYCLE
Total proppant used (lbs): 5314850 Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: 2.375 Tubing Setting Depth: 7632
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 9/4/2019 Test Method: Flowing
Hours Tested: 24 Gas Type: WET
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 207    
    BBLS_OIL 190    
    BTU_GAS 1214    
    CALC_BBLS_H2O 207    
    CALC_BBLS_OIL 190    
    CALC_GOR 1384    
    CALC_MCF_GAS 263    
    CASING_PRESS 2200    
    GRAVITY_OIL 52    
    MCF_GAS 263    
    TUBING_PRESS 1400    
    Perforation Data:
    Interval Bottom: 18070 Interval Top: 8429
    # of Holes: 600 Hole Size: 0.44
Completed information for formation CODL                                     Status: CM         9/12/2019
1st Production Date: N/A Choke Size:
Status Date: 9/12/2019 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 9/12/2019 Treatment End Date: N/A
Treatment summary: 8676-8712, 8713-11511, 11938-12390, 12623-14629, 14894-15314, 15331-15893, 15979-16768, 17102-18070
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CODL .
    Perforation Data:
    Interval Bottom: 18070 Interval Top: 8676
    # of Holes: 600 Hole Size: 0.44
Completed information for formation FTHYS                                     Status: CM         9/12/2019
1st Production Date: N/A Choke Size:
Status Date: 9/12/2019 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: FORT HAYS Status: CM
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 9/12/2019 Treatment End Date: N/A
Treatment summary: 8429-8676, 8712-8713, 14629-14894, 15314-15331, 15893-15979, 16768-17102
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation FTHYS .
    Perforation Data:
    Interval Bottom: 17102 Interval Top: 8429
    # of Holes: 600 Hole Size: 0.44