COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-22988                               Status: PA         8/27/2015
Well Name/No: WOOLLEY #12-7 (click well name for production)
Operator: CRESTONE PEAK RESOURCES OPERATING LLC - 10633
Status Date: 8/27/2015 Federal or State Lease #:
FacilityID: 277773 LocationID: 305447
County: WELD #123 Location: SWNW  7 1N68W 6 PM
Field: WATTENBERG  - #90750 Elevation: 5,095 ft.
Planned Location       2117 FNL  457 FWL Lat/Long: 40.067247/-105.053808 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 40.067215/-105.053741 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PA         8/27/2015
Spud Date: 5/28/2005 Spud Date is: ACTUAL
Wellbore Permit  
Permit #: 20051533 Expiration Date: 5/19/2006
Prop Depth/Form: 8307 Surface Mineral Owner Same: Y
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation and Spacing: Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2
Casing: String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5400, Weight:
Cement: Sacks: 300, Top: 4100, Bottom: 5400, Determination Method:
Wellbore Completed
Completion Date: 10/4/2005
Measured TD: 8325 Measured PB depth: 8304
True Vertical TD: True Vertical PB depth:
Log Types: CBL, DUAL INDUCTION, COMPENSATED NEUTRON
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 815, Weight: 24
Cement: Sacks: 570, Top: 0, Bottom: 815, Determination Method: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 8321, Weight: 11.6
Cement: Sacks: 250, Top: 7885, Bottom: 8321, Determination Method: CBL
Casing: String Type: S.C. 1.1 , Hole Size: , Size: , Top: , Depth: 5102, Weight:
Cement: Sacks: 305, Top: 3880, Bottom: 5102, Determination Method: CBL
Formation Log Top Log Bottom Cored DSTs
SUSSEX 4440 N N
SHANNON 5007 N N
NIOBRARA 7373 N N
FORT HAYS 7713 N N
CODELL 7736 N N
MOWRY 8150 N N
J SAND 8164 N N
Completed information for formation JNBCD                                     Status: CM         10/7/2005
1st Production Date: N/A Choke Size: 0.250
Status Date: 10/7/2005 Open Hole Completion: N
Commingled: Y Production Method: FLOWING
Formation Name: J-NIOBRARA-CODELL Status: CM
Formation Treatment
Treatment Date: 10/4/2005    
Treatment summary: DRILLED UP CBP @ 7620'. DRILLED UP CBP @ 7900' TO COMMINGLE, 10/4/05
Tubing Size: 2.375 Tubing Setting Depth: 8154
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 10/7/2005 Test Method: FLOWING
Hours Tested: 24 Gas Type:
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 128    
    BBLS_OIL 56    
    CALC_BBLS_H2O 128    
    CALC_BBLS_OIL 56    
    CALC_GOR 5196    
    CALC_MCF_GAS 291    
    CASING_PRESS 1141    
    MCF_GAS 291    
    TUBING_PRESS 498    
    Perforation Data:
    Interval Bottom: 8198 Interval Top: 7490
    # of Holes: 240 Hole Size: 0.38
Completed information for formation JSND                                     Status: AB         8/27/2015
1st Production Date: N/A Choke Size:
Status Date: 8/27/2015 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: J SAND Status: AB
Formation Treatment
Treatment Date: 10/4/2005    
Treatment summary: FRAC'D THE JSND (8165-8171' AND 8180-8198') WITH 187,770 GAL FRAC FLUID AND 300,460# SAND, 6/16/05
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation JSND .
    Perforation Data:
    Interval Bottom: 8198 Interval Top: 8165
    # of Holes: 48 Hole Size: 0.38
Completed information for formation NB-CD                                     Status: AB         8/27/2015
1st Production Date: 8/16/2005 Choke Size:
Status Date: 8/27/2015 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA-CODELL Status: AB
Formation Treatment
Treatment Date: 10/4/2005    
Treatment summary: SET CBP @ 7900', 7/24/05. FRAC'D CODL (7736-7754') W/ 130,400 GAL FRAC FLUID, 288,340# 20/40, 8/31/05
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation NB-CD .
    Perforation Data:
    Interval Bottom: 7754 Interval Top: 7490
    # of Holes: 192 Hole Size: 0.38