COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-077-10580                               Status: PR         3/14/2019
Well Name/No: Sup & Shep #0993-25-09W (click well name for production)
Operator: LARAMIE ENERGY LLC - 10433
Status Date: 3/14/2019 Federal or State Lease #:
FacilityID: 455698 LocationID: 334440
County: MESA #077 Location: NESW  25 9S93W 6 PM
Field: BUZZARD CREEK  - #9500 Elevation: 8,078 ft.
Planned Location       2394 FSL  1743 FWL Lat/Long: 39.244812/-107.72346 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         2/21/2019
Job End Date:  3/3/2019
Reported:   3/12/2019
 
Days to report:  9
 
Wellbore Data for Sidetrack #00                                                    Status: PR         3/14/2019
Spud Date: 11/11/2018 Spud Date is: NOTICE
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 6/27/2020 3:01:14 PM
Prop Depth/Form: 8684 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 369-12 , Unit Acreage: 640, Drill Unit: Section 25: All
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 60, Weight: 112
Cement: Sacks: 100, Top: 0, Bottom: 60, Determination Method:
Casing: String Type: SURF , Hole Size: 11, Size: 8.625, Top: 0, Depth: 1530, Weight: 24
Cement: Sacks: 311, Top: 0, Bottom: 1530, Determination Method:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 8684, Weight: 11.6
Cement: Sacks: 1403, Top: 1030, Bottom: 8684, Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 25 Twp: 9S 93W Footage: 2166 N  1500 W Depth
Bottom Hole Location:   Sec: 25 Twp: 9S 93W Footages: 2166 FNL  1500 FWL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         3/1/2019
1st Production Date: 11/1/2018 Choke Size:
Status Date: 3/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .
Completed information for formation N-COM1                                     Status: PR         2/1/2019
1st Production Date: 2/1/2019 Choke Size:
Status Date: 2/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM1.
No Perforation Data was found for formation N-COM1.
Completed information for formation RLNS                                     Status: PR         3/13/2019
1st Production Date: 2/21/2019 Choke Size:
Status Date: 3/13/2019 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: ROLLINS Status: PR
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 2/19/2019 Treatment End Date: 2/19/2019
Treatment summary: 72,500 bbls slickwater; no proppant. RLNS formations completed concurrently with WFCM formation
Total fluid used in treatment (bbls): 72500 Max pressure during treatment (psi): 7216
Total gas used in treatment (mcf): Fluid density (lbs/gal): 8.5
Type of gas: Number of staged intervals: 1
Total acid used in treatment (bbls): Min frac gradient (psi/ft): 0.66
Recycled water used in treatment (bbls): 72500 Total flowback volume recovered (bbls): 31295
Produced water used in treatment (bbls): Disposition method for flowback: RECYCLE
Total proppant used (lbs): Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: 2.375 Tubing Setting Depth: 8031
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 3/13/2019 Test Method: Flowing
Hours Tested: 1 Gas Type: DRY
Gas Disposal: SOLD
Test Type Measure
    BBLS_OIL 1    
    BTU_GAS 1134    
    CALC_BBLS_H2O 2    
    CALC_MCF_GAS 18    
    CASING_PRESS 1820    
    MCF_GAS 1    
    TUBING_PRESS 1100    
    Perforation Data:
    Interval Bottom: 8410 Interval Top: 8410
    # of Holes: 3 Hole Size: 0.37
Completed information for formation WFCM                                     Status: PR         3/14/2019
1st Production Date: 2/21/2019 Choke Size:
Status Date: 3/14/2019 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: WILLIAMS FORK - CAMEO Status: PR
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 2/21/2019 Treatment End Date: 3/3/2019
Treatment summary: 72,500 bbls slickwater; no proppant. RLNS formation completed concurrently with WFCM formation.
Total fluid used in treatment (bbls): 72500 Max pressure during treatment (psi): 7216
Total gas used in treatment (mcf): Fluid density (lbs/gal): 8.5
Type of gas: Number of staged intervals: 6
Total acid used in treatment (bbls): Min frac gradient (psi/ft): 0.66
Recycled water used in treatment (bbls): 72500 Total flowback volume recovered (bbls): 31295
Produced water used in treatment (bbls): Disposition method for flowback: RECYCLE
Total proppant used (lbs): Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: 2.375 Tubing Setting Depth: 8031
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 3/14/2019 Test Method: Flowing
Hours Tested: 1 Gas Type: DRY
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 5    
    BTU_GAS 1134    
    CALC_BBLS_H2O 121    
    CALC_MCF_GAS 900    
    CASING_PRESS 1820    
    MCF_GAS 37    
    TUBING_PRESS 1100    
    Perforation Data:
    Interval Bottom: 8393 Interval Top: 6916
    # of Holes: 171 Hole Size: 0.37