COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-045-18809                               Status: DG         3/24/2020
Well Name/No: NPR O04 #14B-3-696 (click well name for production)
Operator: CAERUS PICEANCE LLC - 10456
Status Date: 3/24/2020 Federal or State Lease #:
FacilityID: 414212 LocationID: 414231
County: GARFIELD #045 Location: Lot 9  4 6S96W 6 PM
Field: GRAND VALLEY  - #31290 Elevation: 6,011 ft.
Planned Location       1488 FSL  1593 FEL Lat/Long: 39.550792/-108.10802 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: DG         3/24/2020
Spud Date: 3/24/2020 Spud Date is: NOTICE
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 8/14/2021 1:08:49 PM
Prop Depth/Form: 9547 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing: String Type: CONDUCTOR , Hole Size: 30, Size: 20, Top: 0, Depth: 100, Weight: 54#
Cement: Sacks: 218, Top: 0, Bottom: 100, Determination Method:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36#
Cement: Sacks: 398, Top: 0, Bottom: 1500, Determination Method:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 4.5, Top: 0, Depth: 9695, Weight: 11.6#
Cement: Sacks: 1121, Top: 3333, Bottom: 9695, Determination Method:
Casing: String Type: 2ND , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 11231, Weight: 12
Cement: Sacks: 590, Top: , Bottom: 11231, Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 3 Twp: 6S 96W Footage: 2486 S  1346 W Depth
Bottom Hole Location:   Sec: 3 Twp: 6S 96W Footages: 2486 FSL  1346 FWL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status:          3/1/2020
1st Production Date: 3/1/2020 Choke Size:
Status Date: 3/1/2020 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .