COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-017-07809                               Status: PA         1/10/2020
Well Name/No: ALC 1545 #1-27 (click well name for production)
Operator: MCCOY PETROLEUM CORPORATION - 55098
Status Date: 1/10/2020 Federal or State Lease #:
FacilityID: 466304 LocationID: 466305
County: CHEYENNE #017 Location: SESE  27 15s45w 6 PM
Field: WILDCAT  - #99999 Elevation: 4,382 ft.
Planned Location       660 FSL  660 FEL Lat/Long: 38.71208/-102.42678 Lat/Long Source: Field Measured
As Drilled Location      Footages Not Available Lat/Long: 38.71208/-102.42678 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PA         1/10/2020
Spud Date: 11/6/2019 Spud Date is: ACTUAL
Wellbore Permit  
Permit #: Expiration Date: 7/26/2021 8:24:22 AM
Prop Depth/Form: 5650 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CMBR , Formation: CAMBRIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: CRTC , Formation: CRETACEOUS , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: DEVN , Formation: DEVONIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: JRSC , Formation: JURASSIC , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: ORDV , Formation: ORDOVICIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: PCMB , Formation: PRECAMBRIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: PRMN , Formation: PERMIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: SLRN , Formation: SILURIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: TRTY , Formation: TERTIARY , Order: , Unit Acreage: , Drill Unit:
Casing: String Type: SURF , Hole Size: 17.5, Size: 13.375, Top: 0, Depth: 350, Weight: 54
Cement: Sacks: 280, Top: 0, Bottom: 350, Determination Method:
Casing: String Type: 1ST , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 2200, Weight: 24
Cement: Sacks: 725, Top: 0, Bottom: 2200, Determination Method:
Casing: String Type: 2ND , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 5650, Weight: 15.5
Cement: Sacks: 500, Top: 1900, Bottom: 5650, Determination Method:
Wellbore Completed
Completion Date: 11/6/2019
Measured TD: 5655 Measured PB depth: 5343
True Vertical TD: True Vertical PB depth:
Log Types: Eli Wireline: Sonic, Caliper, Microlog, Dual Induction, Compensated Density/Neutron, PE, Cement Bond Log
Casing: String Type: SURF , Hole Size: 17.5, Size: 13.375, Top: 0, Depth: 367, Weight: 48
Cement: Sacks: 400, Top: 0, Bottom: 367, Determination Method: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 5650, Weight: 15.5
Cement: Sacks: 280, Top: 0, Bottom: 3942, Determination Method: CBL
Casing: String Type: S.C. 1.1 , Hole Size: 7.875, Size: 5.5, Top: , Depth: 5650, Weight: 15.5
Cement: Sacks: 280, Top: 3942, Bottom: 5650, Determination Method: CBL
Casing: String Type: S.C. 2.1 , Hole Size: 7.875, Size: 5.5, Top: , Depth: 3016, Weight: 15.5
Cement: Sacks: 255, Top: 0, Bottom: 3016, Determination Method: CBL
Additional Cement: String Type: 1ST , Top: 0, Depth: 3016, Bottom: 3016, Sacks: 255, Method: DV TOOL
Formation Log Top Log Bottom Cored DSTs
SHAWNEE 4084
HEEBNER 4282
LANSING B 4336
PAWNEE 4778 Y
CHEROKEE K 4960
ATOKA 5068
MORROW 5133
KEYES 5256
MISSISSIPPIAN-ST LOUIS 5312
SPERGEN 5428 Y
WARSAW 5524
OSAGE 5559 Y
Completed information for formation LSNGB                                     Status: AB         1/6/2020
1st Production Date: N/A Choke Size:
Status Date: 1/6/2020 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: LANSING B Status: AB
Formation Treatment Treatment Type:
Treatment Date: 1/2/2020 Treatment End Date: 1/3/2020
Treatment summary: Perforated Lansing B zone from 4336-4342' (6', 4 SPF). Swabbed all water. Plugged and abandon well on 1/6/2020.
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation LSNGB .
    Perforation Data:
    Interval Bottom: 4342 Interval Top: 4336
    # of Holes: 24 Hole Size: 0.4
Completed information for formation N-COM                                     Status: AB         1/10/2020
1st Production Date: 11/1/2019 Choke Size:
Status Date: 1/10/2020 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: AB
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .
Completed information for formation SHWNE                                     Status: AB         1/6/2020
1st Production Date: N/A Choke Size:
Status Date: 1/6/2020 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: SHAWNEE Status: AB
Formation Treatment Treatment Type:
Treatment Date: 1/3/2020 Treatment End Date: 1/3/2020
Treatment summary: Perforated Shawnee - Oread from 4240-4244' (4', 4 SPF). Swabbed all water. Plugged and abandon well on 1/6/2020.
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation SHWNE .
    Perforation Data:
    Interval Bottom: 4244 Interval Top: 4240
    # of Holes: 16 Hole Size: 0.4
Completed information for formation SPGN                                     Status: AB         1/6/2020
1st Production Date: N/A Choke Size:
Status Date: 1/6/2020 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: SPERGEN Status: AB
Formation Treatment Treatment Type: ACID JOB
Treatment Date: 12/10/2019 Treatment End Date: 12/31/2019
Treatment summary: Perforated Spergen zone from 5470-82' (12'), 5456-68' (12'), 5446-50' (4') and 5428-34' (6'), 2 SPF. Acidized with 1000 gals of 15% MCA acid. Swab tested for total recovery of 161 bbls, 6% oil. Squeezed Spergen perforations with 50 sacks cement. Reperforated Spergen zone from 5470-78' (8', 4 SPF), 5456-68'(12', 2 SPF), 5446-50'(4', 2 SPF) and 5428-34' (6', 2 SPF). Acidized with 1000 gals of 15% MCA acid. ReAcidized Spergen intervals 5428-34' and 5446-50' with 500 gals of 15% NE-FE acid. Swabbed water, 10% oil. ProStim pumped 1500 gals of WSO-41 water curtailment polymer. Re-perforated Spergen zone from 5430-34', 5446-50', 5460-66' and 5470-74', all 2 SPF. ReAcidized Spergen intervals with 750 gals of 15% NE-FE acid. Swabbed water, 8% oil. Plugged and abandon well on 1/6/2020.
Total fluid used in treatment (bbls): 77 Max pressure during treatment (psi): 0
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): 77 Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): 0 Total flowback volume recovered (bbls): 0
Produced water used in treatment (bbls): 0 Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation SPGN .
    Perforation Data:
    Interval Bottom: 5482 Interval Top: 5428
    # of Holes: 68 Hole Size: 0.4