COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-014-20852 Status: PR 9/5/2022 | ||||||||||
Well Name/No: | INTERCHANGE A #S22-30-21N | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 9/5/2022 | Federal or State Lease #: | ||||||||
FacilityID: | 468829 | LocationID: | 456747 | |||||||
County: | BROOMFIELD #014 | Location: | SWNW 10 1S68W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 5,236 ft. | |||||||
Planned Location 2077 FNL 938 FWL | Lat/Long: 39.980949/-104.993846 | Lat/Long Source: Field Measured | ||||||||
Job Date: 4/23/2022 Job End Date: 5/3/2022 |
Reported:
7/8/2022 Originally Reported: 6/23/2022 |
Days to report: 66 Days to report: 51 |
||||||||
Job Date: 4/23/2022 Job End Date: 5/3/2022 |
Reported:
6/23/2022 |
Days to report: 51 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 9/5/2022 | ||||||||||
Spud Date: | 8/27/2021 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 10/22/2021 9:25:20 PM | ||||||
Prop Depth/Form: | 23868 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1040, Drill Unit: GWA | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 23868, Weight: 20 | |||||||||
Cement: | Sacks: 3259, Top: , Bottom: 23868, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 1/24/2022 | |||||||||
Measured TD: | 23479 | Measured PB depth: | 23462 | |||||||
True Vertical TD: | 7928 | True Vertical PB depth: | 7928 | |||||||
Top PZ Location: Sec: 10 Twp: 1S 68W | Footage: 463 N 125 W | Depth | ||||||||
Bottom Hole Location: Sec: 22 Twp: 1S 68W | Footages: 461 FSL 156 FWL | Depth | ||||||||
Log Types: | ||||||||||
Log Types: | CBL, MWD/LWD, (Resistivity on 014-20850). | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1635, Weight: 36 | |||||||||
Cement: | Sacks: 575, Top: 0, Bottom: 1635, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 23467, Weight: 20 | |||||||||
Cement: | Sacks: 3715, Top: 2186, Bottom: 23467, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 4818 | N | N | |||||||
SUSSEX | 5212 | N | N | |||||||
SHANNON | 5784 | N | N | |||||||
SHARON SPRINGS | 8062 | N | N | |||||||
NIOBRARA | 8116 | N | N | |||||||
Completed information for formation NBRR Status: PR 9/5/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 9/5/2022 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | NIOBRARA | Status: | PR | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 4/23/2022 | Treatment End Date: | 5/3/2022 | |||||||
Treatment summary: Frac'd Niobrara with 80 stage plug and perf; 487890 total bbls fluid pumped: 441132 bbls gelled fluid and 46758 bbls fresh water; 10657335 total lbs proppant pumped: 6803020 lbs 40/70 mesh, 3076240 lbs 30/50 mesh, and 778075 lbs 100 mesh. | ||||||||||
Total fluid used in treatment (bbls): | 487890 | Max pressure during treatment (psi): | 8907 | |||||||
Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.3 | |||||||
Type of gas: | Number of staged intervals: | 80 | ||||||||
Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.83 | |||||||
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | |||||||
Produced water used in treatment (bbls): | 46758 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 10657335 | Green completions techniques utilized: | ||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 8421 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 9/5/2022 | Test Method: | FLOWING | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 416 | |||||||||
BBLS_OIL | 103 | |||||||||
BTU_GAS | 1340 | |||||||||
CALC_BBLS_H2O | 416 | |||||||||
CALC_BBLS_OIL | 103 | |||||||||
CALC_GOR | 1544 | |||||||||
CALC_MCF_GAS | 159 | |||||||||
CASING_PRESS | 2983 | |||||||||
GRAVITY_OIL | 50 | |||||||||
MCF_GAS | 159 | |||||||||
TUBING_PRESS | 2017 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 23268 | Interval Top: | 8540 | |||||||
# of Holes: | 3520 | Hole Size: | 0.26 |