COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-014-20850 Status: PR 9/5/2022 | ||||||||||
Well Name/No: | INTERCHANGE A #S22-30-1C | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 9/5/2022 | Federal or State Lease #: | ||||||||
FacilityID: | 468827 | LocationID: | 456747 | |||||||
County: | BROOMFIELD #014 | Location: | SWNW 10 1S68W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 5,236 ft. | |||||||
Planned Location 2188 FNL 877 FWL | Lat/Long: 39.980646/-104.994064 | Lat/Long Source: Field Measured | ||||||||
Job Date: 5/3/2022 Job End Date: 5/14/2022 |
Reported:
7/8/2022 Originally Reported: 6/8/2022 |
Days to report: 55 Days to report: 25 |
||||||||
Job Date: 5/3/2022 Job End Date: 5/14/2022 |
Reported:
6/8/2022 |
Days to report: 25 |
||||||||
Wellbore Data for Sidetrack #00 Status: DG 8/28/2021 | ||||||||||
Spud Date: | 8/28/2021 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 10/22/2021 9:25:20 PM | ||||||
Prop Depth/Form: | 24126 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1040, Drill Unit: GWA | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24126, Weight: 20 | |||||||||
Cement: | Sacks: 3297, Top: , Bottom: 24126, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 2/12/2022 | |||||||||
Measured TD: | 8612 | Measured PB depth: | 8612 | |||||||
True Vertical TD: | 8131 | True Vertical PB depth: | 8131 | |||||||
Top PZ Location: Sec: 10 Twp: 1S 68W | Footage: 173 N 420 W | Depth | ||||||||
Bottom Hole Location: Sec: 10 Twp: 1S 68W | Footages: 173 FNL 420 FWL | Depth | ||||||||
Log Types: | ||||||||||
Log Types: | ||||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1637, Weight: 36 | |||||||||
Cement: | Sacks: 575, Top: 0, Bottom: 1637, Determination Method: VISU | |||||||||
Casing: | String Type: OPEN HOLE , Hole Size: 8.75, Size: , Top: 1637, Depth: 8612, Weight: | |||||||||
Cement: | Sacks: , Top: , Bottom: , Determination Method: | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 4776 | |||||||||
SUSSEX | 5277 | |||||||||
SHANNON | 5655 | |||||||||
SHARON SPRINGS | 8033 | |||||||||
NIOBRARA | 8108 | |||||||||
FORT HAYS | 8591 | |||||||||
Completed information for formation N-COM Status: DG 8/1/2021 | ||||||||||
1st Production Date: | 8/1/2021 | Choke Size: | ||||||||
Status Date: | 8/1/2021 | Open Hole Completion: | ||||||||
Commingled: | Production Method: | |||||||||
Formation Name: | NOT COMPLETED | Status: | DG | |||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation N-COM . | ||||||||||
No Perforation Data was found for formation N-COM . | ||||||||||
Wellbore Data for Sidetrack #01 Status: PR 9/5/2022 | ||||||||||
Spud Date: | 8/28/2021 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 2/16/2025 6:27:37 PM | ||||||
Prop Depth/Form: | 24126 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1040, Drill Unit: GWA | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1637, Weight: 36 | |||||||||
Cement: | Sacks: 575, Top: 0, Bottom: 1637, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24126, Weight: 20 | |||||||||
Cement: | Sacks: 3297, Top: , Bottom: 24126, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 2/25/2022 | |||||||||
Measured TD: | 23651 | Measured PB depth: | 23646 | |||||||
True Vertical TD: | 8185 | True Vertical PB depth: | 8185 | |||||||
Top PZ Location: Sec: 9 Twp: 1S 68W | Footage: 987 N 412 W | Depth | ||||||||
Bottom Hole Location: Sec: 16 Twp: 1S 68W | Footages: 459 FSL 404 FWL | Depth | ||||||||
Log Types: | CBL, MWD/LWD, Resistivity. | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1637, Weight: 36 | |||||||||
Cement: | Sacks: 575, Top: 0, Bottom: 1637, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 23646, Weight: 20 | |||||||||
Cement: | Sacks: 3755, Top: 671, Bottom: 23646, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
PARKMAN | 4766 | N | N | |||||||
SUSSEX | 5277 | N | N | |||||||
SHANNON | 5655 | N | N | |||||||
SHARON SPRINGS | 8033 | N | N | |||||||
NIOBRARA | 8108 | N | N | |||||||
FORT HAYS | 8591 | N | N | |||||||
CODELL | 9232 | N | N | |||||||
CARLILE | 12026 | |||||||||
Completed information for formation CARL Status: CM 11/7/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 11/7/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CARLILE | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/3/2022 | Treatment End Date: | 5/14/2022 | |||||||
Treatment summary: Perforated Intervals: 12026'-12283'; 12384'-12905'; 16513'-17012'; 17143'-17267'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CARL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 17267 | Interval Top: | 12026 | |||||||
# of Holes: | 264 | Hole Size: | 0.26 | |||||||
Completed information for formation CLCDFH Status: PR 9/5/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 9/5/2022 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | CARLILE-CODELL-FORT HAYS | Status: | PR | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/3/2022 | Treatment End Date: | 5/14/2022 | |||||||
Treatment summary: Frac'd Carlile-Codell-Fort Hays with a 60 stage plug and perf. 8658910 total lbs proppant pumped: 6018510 lbs 40/70 mesh and 2640400 lbs 30/50 mesh. 317387 total bbls fluid pumped: 283162 bbls gelled fluid, 34225 bbls fresh water and 0 bbls acid. | ||||||||||
Total fluid used in treatment (bbls): | 317387 | Max pressure during treatment (psi): | 9631 | |||||||
Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.3 | |||||||
Type of gas: | Number of staged intervals: | 60 | ||||||||
Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.41 | |||||||
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | |||||||
Produced water used in treatment (bbls): | 34225 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 8658910 | Green completions techniques utilized: | ||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 8701 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 9/5/2022 | Test Method: | FLOWING | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 82 | |||||||||
BBLS_OIL | 311 | |||||||||
BTU_GAS | 1340 | |||||||||
CALC_BBLS_H2O | 82 | |||||||||
CALC_BBLS_OIL | 311 | |||||||||
CALC_GOR | 1695 | |||||||||
CALC_MCF_GAS | 527 | |||||||||
CASING_PRESS | 3047 | |||||||||
GRAVITY_OIL | 50 | |||||||||
MCF_GAS | 527 | |||||||||
TUBING_PRESS | 2701 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 23601 | Interval Top: | 9232 | |||||||
# of Holes: | 2640 | Hole Size: | 0.26 | |||||||
Completed information for formation CODL Status: CM 11/7/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 11/7/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CODELL | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/3/2022 | Treatment End Date: | 5/14/2022 | |||||||
Treatment summary: Perforated Intervals: 9232'-9495'; 9661'-11827'; 12025'; 12304'-12362'; 12924'-15298'; 15357'-16494'; 17033'-17142'; 17286'- 17620'; 18061'-18777'; 19354'-23601'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CODL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 23601 | Interval Top: | 9232 | |||||||
# of Holes: | 2131 | Hole Size: | 0.26 | |||||||
Completed information for formation FTHYS Status: CM 11/7/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 11/7/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | FORT HAYS | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/3/2022 | Treatment End Date: | 5/14/2022 | |||||||
Treatment summary: Perforated Intervals: 9518'-9639'; 11846'-12008'; 15317'-15338'; 17621'-18060'; 18796'-19335'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation FTHYS . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 19335 | Interval Top: | 9518 | |||||||
# of Holes: | 245 | Hole Size: | 0.26 |