COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-014-20783 Status: PR 11/1/2022 | ||||||||||
Well Name/No: | INTERCHANGE B #S22-30-16C | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 11/1/2022 | Federal or State Lease #: | ||||||||
FacilityID: | 456763 | LocationID: | 456747 | |||||||
County: | BROOMFIELD #014 | Location: | NESW 10 1S68W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 5,206 ft. | |||||||
Planned Location 2205 FSL 1706 FWL | Lat/Long: 39.978175/-104.991095 | Lat/Long Source: Field Measured | ||||||||
As Drilled Location Footages Not Available | Lat/Long: 39.978175/-104.991094 | Lat/Long Source: Field Measured | ||||||||
Job Date: 6/16/2022 Job End Date: 7/4/2022 |
Reported:
7/13/2022 |
Days to report: 9 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 11/1/2022 | ||||||||||
Spud Date: | 9/13/2019 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 8/22/2020 2:39:52 PM | ||||||
Prop Depth/Form: | 25008 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 25008, Weight: 20 | |||||||||
Cement: | Sacks: 3425, Top: 1500, Bottom: 25008, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 5/7/2022 | |||||||||
Measured TD: | 24914 | Measured PB depth: | 24896 | |||||||
True Vertical TD: | 8129 | True Vertical PB depth: | 8129 | |||||||
Top PZ Location: Sec: 10 Twp: 1S 68W | Footage: 320 N 1004 E | Depth | ||||||||
Bottom Hole Location: Sec: 22 Twp: 1S 68W | Footages: 461 FSL 982 FEL | Depth | ||||||||
Log Types: | No logs to upload. | |||||||||
Log Types: | CBL, MWD/LWD, (Resistivity on 014-20850). | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1660, Weight: 36 | |||||||||
Cement: | Sacks: 575, Top: 0, Bottom: 1660, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24901, Weight: 20 | |||||||||
Cement: | Sacks: 3985, Top: 0, Bottom: 24901, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 5109 | N | N | |||||||
SUSSEX | 5691 | N | N | |||||||
SHANNON | 6107 | N | N | |||||||
SHARON SPRINGS | 8898 | N | N | |||||||
NIOBRARA | 8934 | N | N | |||||||
FORT HAYS | 9818 | N | N | |||||||
CODELL | 10480 | |||||||||
CARLILE | 17653 | |||||||||
Completed information for formation CARL Status: CM 11/15/2022 | ||||||||||
1st Production Date: | 9/8/2022 | Choke Size: | ||||||||
Status Date: | 11/15/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CARLILE | Status: | CM | |||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CARL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 17714 | Interval Top: | 17664 | |||||||
# of Holes: | 16 | Hole Size: | 0.26 | |||||||
Completed information for formation CLCDFH Status: PR 9/20/2022 | ||||||||||
1st Production Date: | 9/8/2022 | Choke Size: | ||||||||
Status Date: | 9/20/2022 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | CARLILE-CODELL-FORT HAYS | Status: | PR | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 6/16/2022 | Treatment End Date: | 7/4/2022 | |||||||
Treatment summary: Frac'd Carlile-Codell-Fort Hays with a 67 stage plug and perf; 367419 total bbls fluid pumped: 320125 bbls gelled fluid and 47294 bbls fresh water; 9484935 total lbs proppant pumped: 6638865 lbs 40/70 mesh and 2846070 lbs 30/50 mesh. | ||||||||||
Total fluid used in treatment (bbls): | 367419 | Max pressure during treatment (psi): | 8568 | |||||||
Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.3 | |||||||
Type of gas: | Number of staged intervals: | 67 | ||||||||
Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.89 | |||||||
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | |||||||
Produced water used in treatment (bbls): | 47294 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 9484935 | Green completions techniques utilized: | ||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 9525 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 9/20/2022 | Test Method: | flowing | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 74 | |||||||||
BBLS_OIL | 246 | |||||||||
BTU_GAS | 1340 | |||||||||
CALC_BBLS_H2O | 74 | |||||||||
CALC_BBLS_OIL | 246 | |||||||||
CALC_GOR | 1793 | |||||||||
CALC_MCF_GAS | 441 | |||||||||
CASING_PRESS | 2799 | |||||||||
GRAVITY_OIL | 50 | |||||||||
MCF_GAS | 441 | |||||||||
TUBING_PRESS | 2397 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 24842 | Interval Top: | 9830 | |||||||
# of Holes: | 2948 | Hole Size: | 0.26 | |||||||
Completed information for formation CODL Status: CM 11/15/2022 | ||||||||||
1st Production Date: | 9/8/2022 | Choke Size: | ||||||||
Status Date: | 11/15/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CODELL | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 6/16/2022 | Treatment End Date: | 7/4/2022 | |||||||
Treatment summary: Perforated Intervals: 10480'-10504'; 10810'-12763'; 13203'-13423'; 13505'-17007'; 17249'-17648'; 17729'-19831'; 19931'-24842'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CODL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 24842 | Interval Top: | 10480 | |||||||
# of Holes: | 2607 | Hole Size: | 0.26 | |||||||
Completed information for formation FTHYS Status: CM 11/15/2022 | ||||||||||
1st Production Date: | 9/8/2022 | Choke Size: | ||||||||
Status Date: | 11/15/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | FORT HAYS | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 6/16/2022 | Treatment End Date: | 7/4/2022 | |||||||
Treatment summary: Perforated Intervals: 9830'-10456'; 10505'-10786'; 12764'-13183'; 13443'-13483'; 17029'-17235', 19849'-19922'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation FTHYS . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 19922 | Interval Top: | 9830 | |||||||
# of Holes: | 325 | Hole Size: | 0.26 |