COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-014-20781 Status: PR 11/1/2022 | ||||||||||
Well Name/No: | INTERCHANGE B #S22-30-18N | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 11/1/2022 | Federal or State Lease #: | ||||||||
FacilityID: | 456761 | LocationID: | 456747 | |||||||
County: | BROOMFIELD #014 | Location: | NESW 10 1S68W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 5,206 ft. | |||||||
Planned Location 2213 FSL 1741 FWL | Lat/Long: 39.978189/-104.99097 | Lat/Long Source: Field Measured | ||||||||
As Drilled Location Footages Not Available | Lat/Long: 39.978194/-104.990968 | Lat/Long Source: Field Measured | ||||||||
Job Date: 6/16/2022 Job End Date: 7/5/2022 |
Reported:
7/13/2022 |
Days to report: 8 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 11/1/2022 | ||||||||||
Spud Date: | 9/14/2019 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 8/22/2020 2:39:52 PM | ||||||
Prop Depth/Form: | 24960 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24960, Weight: 20 | |||||||||
Cement: | Sacks: 3418, Top: 1500, Bottom: 24960, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 4/29/2022 | |||||||||
Measured TD: | 24748 | Measured PB depth: | 24735 | |||||||
True Vertical TD: | 7863 | True Vertical PB depth: | 7863 | |||||||
Top PZ Location: Sec: 10 Twp: 1S 68W | Footage: 213 N 492 E | Depth | ||||||||
Bottom Hole Location: Sec: 22 Twp: 1S 68W | Footages: 460 FSL 450 FEL | Depth | ||||||||
Log Types: | No logs to upload. | |||||||||
Log Types: | CBL, MWD/LWD, (Resistivity on 014-20850). | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1666, Weight: 36 | |||||||||
Cement: | Sacks: 550, Top: 0, Bottom: 1666, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24735, Weight: 20 | |||||||||
Cement: | Sacks: 3915, Top: 0, Bottom: 24735, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 5288 | N | N | |||||||
SUSSEX | 5887 | N | N | |||||||
SHANNON | 6316 | N | N | |||||||
SHARON SPRINGS | 9037 | N | N | |||||||
NIOBRARA | 9082 | N | N | |||||||
Completed information for formation NBRR Status: PR 11/1/2022 | ||||||||||
1st Production Date: | 9/8/2022 | Choke Size: | ||||||||
Status Date: | 11/1/2022 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | NIOBRARA | Status: | PR | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 6/16/2022 | Treatment End Date: | 7/5/2022 | |||||||
Treatment summary: Frac'd Niobrara with 90 stage plug and perf; 530515 total bbls fluid pumped: 477147 bbls gelled fluid and 53368 bbls fresh water; 11322578 total lbs proppant pumped: 7130045 lbs 40/70 mesh, 3354658 lbs 30/50 mesh, and 837875 lbs 100 mesh. | ||||||||||
Total fluid used in treatment (bbls): | 530515 | Max pressure during treatment (psi): | 8633 | |||||||
Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.3 | |||||||
Type of gas: | Number of staged intervals: | 90 | ||||||||
Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.83 | |||||||
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | |||||||
Produced water used in treatment (bbls): | 53368 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 11322578 | Green completions techniques utilized: | ||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 9424 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 9/20/2022 | Test Method: | FLOWING | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 175 | |||||||||
BBLS_OIL | 138 | |||||||||
BTU_GAS | 1340 | |||||||||
CALC_BBLS_H2O | 175 | |||||||||
CALC_BBLS_OIL | 138 | |||||||||
CALC_GOR | 1428 | |||||||||
CALC_MCF_GAS | 197 | |||||||||
CASING_PRESS | 2632 | |||||||||
GRAVITY_OIL | 50 | |||||||||
MCF_GAS | 197 | |||||||||
TUBING_PRESS | 1891 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 24667 | Interval Top: | 9560 | |||||||
# of Holes: | 3960 | Hole Size: | 0.26 |