COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-014-20768 Status: PR 9/5/2022 | ||||||||||
Well Name/No: | INTERCHANGE A #S22-30-7C | (click well name for production) | ||||||||
Operator: | EXTRACTION OIL & GAS INC - 10459 | |||||||||
Status Date: | 9/5/2022 | Federal or State Lease #: | ||||||||
FacilityID: | 456745 | LocationID: | 456747 | |||||||
County: | BROOMFIELD #014 | Location: | SWNW 10 1S68W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 5,231 ft. | |||||||
Planned Location 2310 FNL 1138 FWL | Lat/Long: 39.980305/-104.99313 | Lat/Long Source: Field Measured | ||||||||
As Drilled Location Footages Not Available | Lat/Long: 39.980305/-104.993128 | Lat/Long Source: Field Measured | ||||||||
Job Date: 5/15/2022 Job End Date: 5/26/2022 |
Reported:
7/8/2022 Originally Reported: 6/23/2022 |
Days to report: 43 Days to report: 28 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 9/5/2022 | ||||||||||
Spud Date: | 9/23/2019 | Spud Date is: | ACTUAL | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 8/22/2020 1:48:48 PM | ||||||
Prop Depth/Form: | 24223 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: CODL , Formation: CODELL , Order: 407-2222 , Unit Acreage: 1920, Drill Unit: S.10, 15 & 22 - ALL | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: | |||||||||
Casing: | String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 1500, Determination Method: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24223, Weight: 20 | |||||||||
Cement: | Sacks: 3311, Top: 1500, Bottom: 24223, Determination Method: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | 3/20/2022 | |||||||||
Measured TD: | 24236 | Measured PB depth: | 24220 | |||||||
True Vertical TD: | 8142 | True Vertical PB depth: | 8142 | |||||||
Top PZ Location: Sec: 10 Twp: 1S 68W | Footage: 457 N 1849 W | Depth | ||||||||
Bottom Hole Location: Sec: 22 Twp: 1S 68W | Footages: 462 FSL 1878 FWL | Depth | ||||||||
Log Types: | No logs to upload. | |||||||||
Log Types: | CBL, MWD/LWD, (Resistivity on 014-20850). | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 42 | |||||||||
Cement: | Sacks: 100, Top: 0, Bottom: 80, Determination Method: VISU | |||||||||
Casing: | String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1629, Weight: 36 | |||||||||
Cement: | Sacks: 550, Top: 0, Bottom: 1629, Determination Method: VISU | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 24220, Weight: 20 | |||||||||
Cement: | Sacks: 3807, Top: 1386, Bottom: 24220, Determination Method: CBL | |||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
PARKMAN | 4906 | N | N | |||||||
SUSSEX | 5436 | N | N | |||||||
SHANNON | 5809 | N | N | |||||||
SHARON SPRINGS | 8282 | N | N | |||||||
NIOBRARA | 8320 | N | N | |||||||
FORT HAYS | 9070 | N | N | |||||||
CODELL | 9273 | N | N | |||||||
CARLILE | 12020 | |||||||||
Completed information for formation CARL Status: CM 11/9/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 11/9/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CARLILE | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/15/2022 | Treatment End Date: | 5/26/2022 | |||||||
Treatment summary: Perforated Intervals: 12035'-13555'; 17390'-18028'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CARL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 18028 | Interval Top: | 12035 | |||||||
# of Holes: | 375 | Hole Size: | 0.26 | |||||||
Completed information for formation CLCDFH Status: PR 9/5/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 9/5/2022 | Open Hole Completion: | N | |||||||
Commingled: | N | Production Method: | ||||||||
Formation Name: | CARLILE-CODELL-FORT HAYS | Status: | PR | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/15/2022 | Treatment End Date: | 5/26/2022 | |||||||
Treatment summary: Frac'd Carlile-Codell-Fort Hays with 60 stage plug and perf; 360250 total bbls fluid pumped: 325363 bbls gelled fluid and 34887 bbls fresh water; 9383520 total lbs proppant pumped: 6549785 lbs 40/70 mesh and 2833735 lbs 30/50 mesh. | ||||||||||
Total fluid used in treatment (bbls): | 360250 | Max pressure during treatment (psi): | 8569 | |||||||
Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.3 | |||||||
Type of gas: | Number of staged intervals: | 60 | ||||||||
Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.87 | |||||||
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | |||||||
Produced water used in treatment (bbls): | 34887 | Disposition method for flowback: | DISPOSAL | |||||||
Total proppant used (lbs): | 9383520 | Green completions techniques utilized: | ||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | 2.375 | Tubing Setting Depth: | 9015 | |||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
Initial Test Data: | ||||||||||
Test Date: | 9/5/2022 | Test Method: | flowing | |||||||
Hours Tested: | 24 | Gas Type: | WET | |||||||
Gas Disposal: | SOLD | |||||||||
Test Type | Measure | |||||||||
BBLS_H2O | 104 | |||||||||
BBLS_OIL | 316 | |||||||||
BTU_GAS | 1340 | |||||||||
CALC_BBLS_H2O | 104 | |||||||||
CALC_BBLS_OIL | 316 | |||||||||
CALC_GOR | 1706 | |||||||||
CALC_MCF_GAS | 539 | |||||||||
CASING_PRESS | 3085 | |||||||||
GRAVITY_OIL | 50 | |||||||||
MCF_GAS | 539 | |||||||||
TUBING_PRESS | 2731 | |||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 24181 | Interval Top: | 9287 | |||||||
# of Holes: | 2640 | Hole Size: | 0.26 | |||||||
Completed information for formation CODL Status: CM 11/9/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 11/9/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | CODELL | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/15/2022 | Treatment End Date: | 5/26/2022 | |||||||
Treatment summary: Perforated Intervals: 9287'-10807'; 10998'-11556'; 11655'-12014'; 13577'-14743'; 14812'-16864'; 16944'-17325'; 18052'-19217'; 19342'-24181'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation CODL . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 24181 | Interval Top: | 9287 | |||||||
# of Holes: | 2173 | Hole Size: | 0.26 | |||||||
Completed information for formation FTHYS Status: CM 11/9/2022 | ||||||||||
1st Production Date: | 8/25/2022 | Choke Size: | ||||||||
Status Date: | 11/9/2022 | Open Hole Completion: | N | |||||||
Commingled: | Y | Production Method: | ||||||||
Formation Name: | FORT HAYS | Status: | CM | |||||||
Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | ||||||||
Treatment Date: | 5/15/2022 | Treatment End Date: | 5/26/2022 | |||||||
Treatment summary: Perforated Intervals: 10828'-10978'; 11572'-11640'; 14766'-14791'; 16865'-16926'; 17346'-17369'; 19237'-19322'. | ||||||||||
Total fluid used in treatment (bbls): | Max pressure during treatment (psi): | |||||||||
Total gas used in treatment (mcf): | Fluid density (lbs/gal): | |||||||||
Type of gas: | Number of staged intervals: | |||||||||
Total acid used in treatment (bbls): | Min frac gradient (psi/ft): | |||||||||
Recycled water used in treatment (bbls): | Total flowback volume recovered (bbls): | |||||||||
Produced water used in treatment (bbls): | Disposition method for flowback: | |||||||||
Total proppant used (lbs): | Green completions techniques utilized: | |||||||||
Reason green techniques not utilized: | ||||||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation FTHYS . | ||||||||||
Perforation Data: | ||||||||||
Interval Bottom: | 19322 | Interval Top: | 10828 | |||||||
# of Holes: | 92 | Hole Size: | 0.26 |