COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-001-09948                               Status: PR         11/1/2019
Well Name/No: Rio LC #12-363HNX (click well name for production)
Operator: GREAT WESTERN OPERATING COMPANY LLC - 10110
Status Date: 11/1/2019 Federal or State Lease #:
FacilityID: 446019 LocationID: 320491
County: ADAMS #001 Location: NWNW  6 1S67W 6 PM
Field: WATTENBERG  - #90750 Elevation: 5,070 ft.
Planned Location       383 FNL  155 FWL Lat/Long: 39.99929/-104.939779 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         9/25/2019
Job End Date:  10/15/2019
Reported:   10/31/2019
 
Days to report:  16
 
Wellbore Data for Sidetrack #00                                                    Status: PR         11/1/2019
Spud Date: 6/28/2019 Spud Date is: NOTICE
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 6/6/2021 3:45:41 PM
Prop Depth/Form: 17479 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12: All
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1700, Weight: 36
Cement: Sacks: 707, Top: 0, Bottom: 1700, Determination Method:
Casing: String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 17479, Weight: 17
Cement: Sacks: 1739, Top: , Bottom: 17479, Determination Method:
Casing: String Type: 1ST LINER , Hole Size: 6.125, Size: 4.5, Top: 7067, Depth: 12599, Weight: 13.5
Cement: Sacks: , Top: , Bottom: , Determination Method:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 1 Twp: 1S 68W Footage: 460 N  855 E Depth
Bottom Hole Location:   Sec: 12 Twp: 1S 68W Footages: 360 FSL  860 FEL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         11/1/2019
1st Production Date: 9/1/2019 Choke Size:
Status Date: 11/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .