COGIS - COA/BMP Information

MORNING GUN EXPLORATION LLC           Castor 7-59 12-1-9           Well API # 05-123-50200           Status: XX        Status Date: 06/11/2019           Location ID #:465272       SWSE 12 7N 59W WELD

COGIS - Conditions of Approval
COA Search Results - 3 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
401782314
06/11/2019
COGCC COA: Operator will ensure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore beyond the setback was completed.
Form: (02 )
401782314
06/11/2019
1) Submit Form 42 online to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 90 days after first sales, as reported on the Form 5A, Completed Interval Report.
Form: (02 )
401782314
06/11/2019
Operator acknowledges the proximity of the listed offset well(s). Operator agrees to comply with the DJ Basin Horizontal Offset Policy to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the mitigated well(s), stating that appropriate mitigation was completed prior to the hydraulic stimulation of this well. Offset wells to mitigate: 05-123-05404, H D LAUER ESTATE 1 05-123-05409, H D LAUER 2 05-123-05419, FRANK W. TURNER 1 05-123-05425, ADDINGTON 1 05-123-05438, TURNER 2 05-123-05439, TURNER 1 05-123-05440, SEIGFRIED 1 05-123-05448, STATE 1 05-123-11866, BOWMAN 1-1 05-123-12600, BOWMAN 1-1 05-123-13278, LIND 1 05-123-13472, LAUER 1 05-123-13887, CASTOR 1 05-123-14146, CASTOR 2 05-123-14615, CASTOR 3 05-123-14643, FAYE 1


COGIS - Best Management Practices
BMPSearch Results - 3 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401782314
06/11/2019
Drilling/Completion Operations
Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
Form: (02 )
401782314
06/11/2019
Drilling/Completion Operations
Alternative Logging Program: One of the first wells drilled on the pad will be logged with Open Hole Resistivity Log and Gamma Ray Log from the kick-off point to into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state "Alternative Logging Program - No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
Form: (02 )
401782314
06/11/2019
Drilling/Completion Operations
If a skid is performed for the subject well, then the only required BOPE tests are for the BOPE connection bonnet seal breaks, as long as a full BOPE test was performed at the beginning of the pad, and as long as all necessary BOPE tests are completed at least every 30 days during the pad operations.