COGIS - COA/BMP Information

CHEVRON USA INC           EMERALD 72X           Well API # 05-103-08104           Status: TA        Status Date: 08/15/2018           Location ID #:315224       SWNW 30 2N 102W RIO BLANCO

COGIS - Conditions of Approval
COA Search Results - 7 record(s) returned.
Source
Document
Conditions of Approval
Form: (04 )
401189012
03/22/2018
This approval is good for one year and a new application must be made before January 19, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
Form: (04 )
401521406
03/22/2018
This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
Form: (04 )
401734733
08/17/2018
This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
Form: (04 )
401880397
02/28/2019
This approval is good for one year and a new application must be made before January 10, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
Form: (02 )
401756721
07/12/2019
1. Injection is not authorized until approval of Subsequent Forms 31 and 33. 2. Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 3. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss acid and fracturing jobs. Approval of Form 4 may be required for acid and fracturing jobs. (As of 4/13/2016) 4. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 may be required for step rate and injectivity tests. 5. For all converted Underground Injection Control wells a Cement Bond Log (CBL) is required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF, TIFF, or PDS visual image is required. 6. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted. 7. Well must pass MIT witnessed by COGCC before Subsequent Forms 31 and 33 will be approved. Well in must be in injection configuration.
Form: (05A )
401734723
06/27/2019
Well passed MIT on 3/14/2018. Doc # 401576409.
Form: (02 )
401756721
07/12/2019
If this conversion to injection results in additional surface disturbance, a Form 2A is required prior to commencement of operations with heavy equipment. If this conversion to injection requires additional aboveground production facilities within the boundaries of the existin oil and gas location, a Form 2A describing the location shall be submitted within 60 days of approval of this APD.


COGIS - Best Management Practices
BMPSearch Results - No Records Found
Source
Document
BMP TypeBMP