COGIS - Conditions of Approval Results

   KERR MCGEE OIL & GAS ONSHORE LP    MAE J 8-8HZ   WELL#: 467438   Status:PR as of 4/1/2021   SESW 8 1N 68W WELD COUNTY
Search Results - 2 record(s) returned.
Type Source Conditions of Approval
Best Management Practices
Engineer
02
401905156
6/26/2019
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log. 
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered.

Engineer
02
401905156
6/26/2019
Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.

COGIS - Best Management Practices COGIS - Best Management Practices Results

Search Results - 3 record(s) returned.
BMP TypeSource BMP
Drilling/Completion Operations
02
401905156
8/7/2019
317.p Open Hole Logging Exception: One of the first wells drilled on the pad will be logged with cased-hole neutron log with gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall state “Open Hole Logging Exception - No open-hole logs were run”, and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run."
Drilling/Completion Operations
02
401905156
8/7/2019
Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling.
Drilling/Completion Operations
02
401905156
8/7/2019
Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.