COGIS - Conditions of Approval Results

   PDC ENERGY INC    Volt 19NA   WELL#: 466552   Status:XX as of 8/9/2019   SWSW 5 5N 66W WELD COUNTY
Search Results - 1 record(s) returned.
Type Source Conditions of Approval
Best Management Practices
Engineer
02
401959836
5/20/2019
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 
3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered.

Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.

COGIS - Best Management Practices COGIS - Best Management Practices Results

Search Results - 3 record(s) returned.
BMP TypeSource BMP
Drilling/Completion Operations
02
401959836
4/8/2019
Operator will comply with COGCC policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg area dated May 29, 2012.
Drilling/Completion Operations
02
401959836
4/8/2019
Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
Drilling/Completion Operations
02
401959836
4/8/2019
Alternative Logging Program: One of the first wells on this pad will be logged with open-hole resistivity log with gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program - No open-hole logs were run”, and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.