COGIS - Conditions of Approval Results

   CRESTONE PEAK RESOURCES OPERATING LLC    Waste Connections 29H-M168   LOCATION#: 434375   Status:AC as of 1/7/2019 11:26:18 AM   NESW 29 1N 68W WELD COUNTY
Search Results - No Records Found
Type Source Conditions of Approval
Best Management Practices

COGIS - Best Management Practices COGIS - Best Management Practices Results

Search Results - 6 record(s) returned.
BMP TypeSource BMP
Community Outreach and Notification
02A
400428096
7/25/2013
Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1/2) mile of the well-site.
Construction
02A
400428096
7/25/2013
Utilize steel-rim berms around tanks and separators instead of sand or soil berms
Drilling/Completion Operations
02A
400428096
7/25/2013
Utilize closed-loop systems for drilling and completion operations to minimize the need for earthen pits
Emissions mitigation
02A
400428096
7/25/2013
Utilize a high-low pressure vessel (HLP) and vapor recovery unit (VRU) for new wells drilled. Encana may remove the VRU system at such time Encana determines that the VRU system is no longer necessary due to reduced emission recoveries and/or efficiencies, but no earlier than one (1) year after the new well is drilled
Planning
02A
400428096
7/25/2013
Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana.
Planning
02A
400428096
7/25/2013
Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the well-site for informational purposes only, which Encana may revise from time to time during operations: a) A summary of planned operations, including identified access points and operational timeline, for posting to a local community information web-page b) A site plan for site preparation, mobilization and demobilization c) A plan for interim reclamation and vegetation of the site and final reclamation of the site d) A plan for noise, light and dust mitigation, to the extent feasible e) A traffic management plan f) Updates of this information if any change during operations