6/2/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42 per Rule 316C.c.

COGIS - Best Management Practices COGIS - Best Management Practices Results

Search Results - 46 record(s) returned.
BMP TypeSource BMP
Community Outreach and Notification
02A
400746954
12/11/2014
Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana. Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1/2) mile of the well-site. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the well-site for informational purposes only, which Encana may revise from time to time during operations: a) A summary of planned operations, including identified access points and operational timeline, for posting to a local community information web-page b) A site plan for site preparation, mobilization and demobilization c) A plan for interim reclamation and vegetation of the site and final reclamation of the site d) A plan for noise, light and dust mitigation, to the extent feasible e) A traffic management plan f) Updates of this information if any change during operations
Community Outreach and Notification
04
400887766
8/28/2015
Encana shall include its contact information on both the mailed notice required by Article III, Section 8 and the posted notice required by Article III, Section 9. This information shall include both a telephone number for Encana and the address and hours of Encana’s Erie community office. Members of the public with concerns or complaints regarding the oil and gas development covered by this Agreement may use this information to speak with Encana.
Construction
02A
400450063
7/25/2013
Utilize steel-rim berms around tanks and separators instead of sand or soil berms
Construction
02A
400746954
12/11/2014
The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
Construction
02A
400746954
12/11/2014
Encana utilizes 24” tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall. In addition, Encana best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall. Protrusions of piping that come through the liner include a fully sealed “boot” to prevent leakage.
Construction
02A
400746954
12/11/2014
Encana will install fencing to restrict access to wellheads and equipment
Construction
02A
400746954
12/11/2014
At the time of construction, all leasehold roads will be constructed to accommodate local emergency vehicle access requirements, and will be maintained in a reasonable condition.
Construction
02A
400746954
12/11/2014
803 - To the extent practicable, site lighting shall be directed downward and inward and shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet.
Drilling/Completion Operations
02A
400450063
7/25/2013
Utilize closed-loop systems for drilling and completion operations to minimize the need for earthen pits Utilize a high-low pressure vessel (HLP) and vapor recovery unit (VRU) for new wells drilled. Encana may remove the VRU system at such time Encana determines that the VRU system is no longer necessary due to reduced emission recoveries and/or efficiencies, but no earlier than one (1) year after the new well is drilled
Drilling/Completion Operations
04
400887766
8/28/2015
Encana has developed and implemented a company-wide Responsible Products Program to manage the fluid products used in its hydraulic fracturing operations. This Responsible Products Program helps Encana evaluate the hydraulic fracturing fluid products it uses in its operations for safety, effectiveness and potential public health and environmental impacts. As part of this program, Encana has informed all of its hydraulic fracturing fluid product suppliers that any products containing diesel fuels (as defined by EPA 816-R-12-004), 2-Butoxyethanol (2-BE), benzene or heavy metals (i.e. lead, mercury, arsenic, cadmium and chromium) cannot be used in hydraulic fracturing at Encana operations. Encana will continue to conduct its hydraulic fracturing operations within the Erie town limits in accordance with its Responsible Products Program.
Drilling/Completion Operations
04
400887766
8/28/2015
Encana shall use closed-loop systems for drilling and completion operations.
Drilling/Completion Operations
02A
400746954
12/11/2014
Encana will utilize a closed-loop system for drilling operations at this location.
Drilling/Completion Operations
02A
400746954
12/11/2014
Encana will not utilize pits.
Drilling/Completion Operations
02A
400746954
12/11/2014
All newly installed or replaced crude oil and condensate storage tanks will be designed, constructed, and maintained in accordance with National Fire Protection Association (NFPA) Code 30 (2008 version). Encana will maintain written records verifying proper design, construction, and maintenance, and will make these records available for inspection by the Director. In addition, onsite inspections are conducted internally to insure guidelines are met.
Drilling/Completion Operations
02A
400746954
12/11/2014
604.c.(2)H – Encana will employ a rig without kelly that has double ram with blind and pipe ram and an annular preventer. At least one person at the well site during drilling operations will have Mineral Management certification or Director approved training for blowout prevention.
Drilling/Completion Operations
02A
400746954
12/11/2014
604.c.(2)I- Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections will be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results will be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
Drilling/Completion Operations
02A
400746954
12/11/2014
604.c.(2)J – Adequate blowout prevention equipment will be used on all well servicing operations. Backup stabbing valves shall be required on well servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using both low-pressure air and high-pressure fluid.
Emissions mitigation
04
400887766
8/28/2015
Well leak detection and repair (a) To identify leaks, Encana will perform audio, visual and olfactory inspections on a monthly basis at all of its new and existing wells and related facilities and equipment within Erie’s Town Limits, provided that such related facilities and equipment are located on the pads for such wells, are part of adjacent tanks used for such pad sites, or are part of storage tanks for such pad sites authorized under Article IV, Section 4 of the Operator Agreement. Encana will also inspect each such well with an infra-red camera on a monthly basis. The initial baseline inspections will occur within sixty (60) calendar days after the Effective Date. After a well has produced for twelve (12) months, the frequency of such inspections shall decrease from monthly to quarterly. If Encana determines that any repairs are required based on these inspections, Encana will promptly initiate these repairs. (b) Encana will report to Erie on the inspection results and any associated repairs the month after the inspection or repair occurs. This information will be collectively reported on a monthly basis in the same format that Encana uses for reporting to the Air Pollution Control Division under Regulation 7, but that is specific to wells located within the Erie Town Limits. Erie will make this information publicly available. (c) This BMP will terminate five (5) years after the Effective Date, after which Encana will continue to comply with the leak detection, repair, and reporting requirements of Regulation 7, as such requirements may be amended.
Emissions mitigation
04
400887766
8/28/2015
In an effort to reduce air emissions, Encana intends to construct a central gathering and storage facility at a location in 1N-68W-Section 21 (the “Hub”) to receive liquids from the wells which are the subject of this Agreement. As a result, Encana will not install hydrocarbon storage tanks at these pad sites, which will eliminate potential sources of hydrocarbons from the sites. However, Encana will still install at the pad sites all other equipment and facilities necessary for the production of hydrocarbons, including wellhead equipment, separation equipment, electrical equipment, and temporary flowback equipment (including temporary storage tanks). In addition, this BMP is subject to Article IV, Sections 3 and 4 of the Agreement.
Emissions mitigation
02A
400746954
12/11/2014
Flow lines, separators, and sand traps capable of supporting green completions as described in Rule 805 will be installed on subject location at which commercial quantities of gas are reasonably expected to be produced based on existing adjacent wells within 1 mile.
Emissions mitigation
02A
400746954
12/11/2014
Encana will follow and comply with all leak detection and repair  and storage tank emission management plan conditions as required by Colorado Air Quality Control Commission Regulation Number 7.  This will include at least monthly Audible, Visual and Olfactory (AVO) inspections of the components and tanks at our Production Facilities at most weekly or at least monthly starting on January 1, 2015.  In addition, Encana will perform infra-red camera inspections of these components and the storage tanks at most monthly or at least annually.  
Emissions mitigation
02A
400746954
12/11/2014
Current Encana drilling operations into and through productive horizons are planned to keep a hydrostatic “over-balance” on the formation. Encana does not intentionally drill ahead with flares and in cases where we do have flares, they are intermittent and only kept for the amount of time it takes to raise our drilling fluid weight to be over-balanced again. In more extreme cases of Well Control Operations, it’s possible to encounter a prolonged flare. This is required in order to bring operations back to normal and ensure proper safety of the rig/rig crews involved during this operation. These flaring instances are rare, but do occur. Encana typically has a good understanding of the pore pressures and will plan accordingly in order to help mitigate potential light impacts to nearby residents.
General Housekeeping
02A
400746954
12/11/2014
Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
General Housekeeping
02A
400746954
12/11/2014
All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner.
General Housekeeping
02A
400746954
12/11/2014
The well site will be cleared of all non-essential equipment, trash and debris after ninety days of a well P&A.
General Housekeeping
04
400887766
8/28/2015
Encana will install down cast lighting or some other form of lighting that mitigates light pollution and spill-over onto adjacent properties; provided, however, that Encana may still use lighting that is necessary for public and occupational safety.
General Housekeeping
04
400887766
8/28/2015
Access roads to well and production facilities that connect to a street within Erie shall be improved from the point of connection to a street within Erie a minimum distance of two hundred (200) feet on the access road as specified by the then current requirements of the Code.
General Housekeeping
02A
400746954
12/11/2014
Encana will identify plugged and abandoned wellbores according to Rule 319.a.(5). including the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). Encana will also inscribe or imbed the well number and date of plugging upon the permanent monument.
General Housekeeping
04
400887766
8/28/2015
Upon the request of either party, the Parties may revise one or more of these BMPs if they mutually agree such revision would better avoid or mitigate impacts the BMP(s) is intended to address.
General Housekeeping
04
400887766
8/28/2015
Encana will recycle and reuse water at the pad sites and otherwise minimize waste water production to the extent that it determines such recycling, reuse, and waste water minimization is technically and economically feasible.
General Housekeeping
04
400887766
8/28/2015
Oil and gas well facilities (above ground) within the Erie Town Limits shall be fenced as specified by the then current requirements of the Code.
General Housekeeping
04
400887766
8/28/2015
Road repairs. (a) Erie and Encana recognize that truck traffic accessing the Identified Well Pads may cause damage to Erie roads and that road repairs may be needed to mitigate such damage. To this end, Encana will arrange for a qualified outside consultant to perform a road impact study for all Erie roads that are used to access an Identified Well Pad during the Term of this Agreement. The consultant will conduct the first part of the study prior to Encana’s operations at such Well Pad and the second part of the study after Encana completes all drilling and hydraulic fracturing at such Well Pad. Encana and Erie will use these studies to determine the extent of any damage accruing to the road during the study period. Encana will then promptly pay Erie to repair such damage or else arrange and pay the cost of such repairs itself whichever Erie prefers. (b) Encana shall maintain Financial Assurance to secure its road repair obligations under this Agreement. The amount of such Financial Assurance shall equal Erie’s annual road maintenance budget as of the Effective Date multiplied by the percentage yielded by dividing the total number of Erie road miles as of the Effective Date into the number of such road miles that Encana will use to access the Identified Well Pads. Encana shall select the form of such Financial Assurance and shall maintain such Assurance until Encana fulfills its obligation to repair road damage under Subsection (a).
Material Handling and Spill Prevention
02A
400746954
12/11/2014
All loadlines will be capped for every location in the DJ.
Material Handling and Spill Prevention
02A
400746954
12/11/2014
Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
Material Handling and Spill Prevention
02A
400746954
12/11/2014
• Annual hydrostatic test on the oil dump line from the separator to the tank battery. • Annual hydrostatic “static” tests on our oil tanks. • Annual hydrostatic “static” tests on our produced water tank and water dump line from the separator to the produced water tank. • Lease Operator inspections of all equipment not to exceed 48 hours. • Monthly documented inspections (EU). • Annual environmental inspections of all battery and well equipment and pads. • Annual UT inspections of the pressure vessels and input into Encana’s RIPL Predictive Integrity Maintenance Program. (HLP separators and fuel gas separators)
Material Handling and Spill Prevention
04
400887766
8/28/2015
Encana shall use steel rim berms or some other state of the art technology that will contain fluids and other material instead of sand or soil berms.
Noise mitigation
04
400887766
8/28/2015
Encana will comply with the following noise mitigation requirements at all pad sites: (a) For db(A) scale noise, Encana will insure that the noise level from operations subject to the light industrial zone noise standard under COGCC Regulations 802.b and 604.c.(2)(A) does not exceed sixty (60) db(A) and that the noise level from operations subject to the industrial zone noise standard under COGCC Regulations 802.b and 604.c.(2)(A) is reduced at least five (5) db(A) below the maximum level permitted by those Regulations. For this purpose, the noise level shall be measured as set forth in COGCC Regulations 802.b & c, except no measurements shall be taken when traffic is passing the sound level meter, Encana shall be present during all measurements, and building units shall be limited to those units existing as of the Effective Date. As set forth in COGCC Regulation 802.b, the noise levels shall be subject to increase for a period not to exceed fifteen (15) minutes in any one (1) hour period and reduction for periodic, impulsive or shrill noises. (b) For db(C) scale noise, Encana shall comply with the requirements of COGCC Regulation 802, as such requirements may be amended during the term of this Agreement.
Noise mitigation
02A
400746954
12/11/2014
Encana will perform a baseline noise survey prior to any operational activity measuring dBA at a distance 350 feet from the noise source (unless there is an occupied structure closer than that – then measurement will be taken 25 feet from the structure). If low frequency noise is a concern, measurement of dBC will be taken 25 feet from the occupied structure towards the noise source. As necessary, based on the survey, Encana will install temporary sound walls to minimize noise and light impacts during drilling and completions and will install permanent noise mitigation at the facility location as necessary to meet all COGCC regulations.
Planning
04
400887766
8/28/2015
Distance to Erie Building Units. For theVessels Minerals Well Pad, the minimum distance between a well or surface equipment, and the nearest exterior wall of an existing Erie Building Unit (as of the Effective Date) shall not be less than the following 1,050 feet. Compliance with this requirement shall be determined from the actual as-built locations of the well or surface equipment. Nothing herein shall be construed to grant Encana any surface rights on property owned by the Town or another person. No Pad Site will be located on Town property without authorization by the Town Board of Trustees.
Planning
02A
400450063
7/25/2013
Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana. Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1/2) mile of the well-site. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the well-site for informational purposes only, which Encana may revise from time to time during operations: a) A summary of planned operations, including identified access points and operational timeline, for posting to a local community information web-page b) A site plan for site preparation, mobilization and demobilization c) A plan for interim reclamation and vegetation of the site and final reclamation of the site d) A plan for noise, light and dust mitigation, to the extent feasible e) A traffic management plan f) Updates of this information if any change during operations
Planning
04
400887766
8/28/2015
Encana shall conduct all operations in accordance with the plans discussed during the Conceptual Review Process as updated from time to time.
Pre-Construction
02A
400746954
12/11/2014
604.c.(2)E – 15 wells will be drilled from this pad and will utilized the existing location.
Traffic control
02A
400746954
12/11/2014
604.c.(2)D - a traffic plan shall be coordinated with the local jurisdiction prior to commencement of move in and rig up. Any subsequent modification to the traffic plan will be coordinated with the local jurisdiction.
Traffic control
04
400887766
8/28/2015
Encana will implement the Traffic Management Plan required by Article III, Section 3, Subpart 10.
Traffic control
04
400887766
8/28/2015
To reduce truck traffic, Erie and Encana will encourage the use of nearby water resources for the drilling and hydraulic fracturing of wells at the pad sites, including the use of Erie municipal water when determined technically feasible and economically practicable by Encana.
Underground Injection Control
04
400887766
8/28/2015
Encana shall not develop any new Class II underground injection control wells within the Operator Agreement Area during the Term of this Agreement.