<_x0034_00806110>
400806110 05 100185 ENCANA OIL & GAS (USA) INC
370 17TH ST STE 1700
DENVER CO 80202-5632 Erin Lind 720 876-5827 Erin Lind Regulatory Analyst 2015-03-09T14:49:31.03-06:00 DRAFT linde 2015-03-09T14:49:31.03-06:00 linde erin.lind@encana.com 0.00000 erin.lind@encana.com linde linde 2015-03-23T14:13:55.827-06:00 400806110 05 123 38080 00 WELD File 3M-32H K268 NESW 32 2N 68W 6 1760 FSL WATTENBERG 1712 90750 FWL 2015-01-08T00:00:00-07:00 2015-01-08T00:00:00-07:00 872 4959 4989 40.092574 -105.030717 2015-03-10T00:00:00-06:00 CHRIS BETTENCOURT 1.1 Preliminary Completion 400806110 Drilling activities for this location were suspended on January 15th, 2015 due to economic reasons. The anticipated date that activities will resume is August 16th, 2015, although that date is subject to change. 400806110 400806110 FORM 5 SUBMITTED 400806110.pdf 400806110 400806111 CEMENT JOB SUMMARY File 3M-32H Surface Cement Ticket.pdf 747950 400806110 CONDUCTOR 30 16 42 148 160 148 0 0 CALC ACTUAL 400806110 SURF 12 1 4 9 5 8 36 854 347 872 0 0 CALC ACTUAL 400806110 cement work 400806110 cement work Thread was being aborted.