<_x0034_00619124>
400619124 05A 8960 BONANZA CREEK ENERGY OPERATING COMPANY LLC
410 17TH STREET SUITE #1400
DENVER CO 80202 Olga Chikaloff 720 440-1600 720 279-2331 Olga Chikaloff Engineering Technician 2014-06-03T09:41:28.86-06:00 DRAFT Chikaloff 2014-06-03T09:41:28.86-06:00 Chikaloff ochikaloff@bonanzacrk.com 0.00000 ochikaloff@bonanzacrk.com Chikaloff Chikaloff 2014-06-17T10:01:39.937-06:00 400619124 05 123 38706 00 WELD Antelope Y44-U41-18HNC SWSE 18 5N 62W 6 WATTENBERG 90750 400619124 400619124 FORM 5A SUBMITTED 400619124.pdf 400619124 400619176 WELLBORE DIAGRAM Antelope Y44-U41-18HNC- WBD.pdf 128725 400619124 NBRR N 6965 11127 Y 18 Stage Niobrara pumped a total of 59,424 bbls of fluid (Phaser) and 4,115,418 # of sand (40/70 Ottawa, 20/40 Ottawa, 20/40 Prop Star); ATP 4,095 psi, ATR 51.00 bpm, Final ISDP 3,236 psi; completed with sliding sleeves and casing packers. 2014-04-27T00:00:00-06:00 72 885 924 1266 Flowing 1225 800 43 1311 SOLD 295 308 422 1044 2 6675 3 8 WET 2014-04-03T00:00:00-06:00 2014-04-24T00:00:00-06:00 2014-04-16T00:00:00-06:00 PR 2014-04-04T00:00:00-06:00 59424 59424 4115418 4648 8.33 18 0.94 11738 DISPOSAL true FRACTURE STIMULATION Thread was being aborted.