<_x0034_00575163>
400575163 06 96155 WHITING OIL AND GAS CORPORATION
1700 BROADWAY STE 2300
DENVER CO 80290 James Kopp 303 357-1410 303 390-4292 Sonia Stephens Regulatory Technician 2014-03-20T09:00:02.5-06:00 DRAFT sstephens 2014-03-20T09:00:02.5-06:00 sstephens regulatory@petro-fs.com 0.00000 james.kopp@whiting.com sstephens sstephens 2014-03-20T11:00:35.61-06:00 400575163 Rains, Bill 970 590-6480 05 123 05779 00 FREGEAU 1 SESE 9 10N 58W 6 WELD WILDCAT 99999 N OTHER N 40.847514 -103.863707 1997-02-04T00:00:00-07:00 0.0 * Access Letter and Pictures are attached as "Other" Re-Plug and Abandon Procedure 1. Notify COGCC at least 48 hours prior to the start of operations using a Form 42. Verify with James Kopp that this is a completed prior to moving the rig in. 2. Take GPS coordinates of well location. Send information to James Kopp James.Kopp@whiting.com 303-357-1410 3. MIRU Bayou Rig. Mob-in pump, swivel, tank, and 2-7/8" PH-6 work sting. NU 7-1/16" 5K BOP w/ 2-7/8" pipe rams on top and blind rams on bottom, pressure test high and low. PU 6/14" bit and TIH on 2-7/8" tubing. 4. Drill out existing cement plugs down to 160'. 5. Clean out to approximately 5,725' 6. Once depth has been reached, TOOH with 2-7/8" work string standing back. 7. MIRU gyro equipment. PU tools and RIH while logging down to 5,725'. POOH while logging, LD tools. 8. MIRU cement crew. Pressure test surface lines to 2,000psi. Mix and pump 60sacks, API Class G, 1.15 cu-ft/sk, 15.8ppg cement, balancing plug at 5,700'KB. Tooh with 2-7/8" work string standing back. Let cement cure overnight. 9. TIH with 2-7/8" workstring. Tag TOC with EOT, record depth. 10. MIRU cement crew. Pressure test surface lines to 2,000psi. Mix and pump 60 sks, API Class G, 1.15 cu-ft/sl 15.8ppg cement, balancing plug at 850' KB. TOOH with 2-7/8" work string standing back. Let cement cure overnight. 11. TIH with 2-7/8" work string. Tag TOC with EOT, record depth. 12. MIRU cement crew. Pressure test surface lines to 2,000psi. Mix and pump 90 sks, API Class G, 1.15 cu-ft/sk, 15.8 ppg cement, balancing plug from 250' KB to surface. TOOH with 2-7/8" workstring, LD on float. 13. Cut off WH to 5' below GL and fill hole. 14. Weld on cap with plugging information plate. Backfill cellar. 15. Reclaim disturbed surface. bill.rains@state.co.us true 400575163 400575163 FORM 6 INTENT SUBMITTED 400575163.pdf 400575163 400575230 WELLBORE DIAGRAM Current Wellbore Diagram_Fregeau 1.pdf 155679 400575163 400575231 WELLBORE DIAGRAM Proposed Wellbore Diagram_Fregeau 1.pdf 165927 400575163 400575232 PROPOSED PLUGGING PROCEDURE Re-Plug and Abandon Procedure_Fregeau 1.pdf 68825 400575163 400575238 OTHER Fregeau 1 Location Photos.pdf 407299 400575163 400575241 OTHER Access Letter - Signed_Jeffrey Fregeau.pdf 20432 400575163 0 false 400575163 1 false 400575163 2 OPEN HOLE 60 5500 5700 true 400575163 3 OPEN HOLE 60 650 850 true 400575163 4 false 400575163 5 false 400575163 6 false 400575163 7 false 400575163 8 false 400575163 9 false 400575163 10 90 0 250 false 400575163 11 false 400575163 12 false 400575163 13 false 400575163 14 false 400575163 15 false 400575163 16 false 400575163 SURF 12 1 4 9 5 8 32.3 160 90 160 0 ACTUAL Thread was being aborted.