<_x0034_00496766>
400496766 05A 100264 XTO ENERGY INC
382 CR 3100
AZTEC NM 87410 Dee Johnson 505 333-3164 Dolena Johnson Reg Compliance Tech 2013-10-16T14:00:57.377-06:00 DRAFT johnsond 2013-10-16T14:00:57.377-06:00 johnsond dee_johnson@xtoenergy.com 0.00000 dee_johnson@xtoenergy.com johnsond johnsond 2013-10-16T14:49:27.343-06:00 400496766 05 071 07777 00 LAS ANIMAS HILL RANCH 18-16 SESE 18 35S 67W 6 PURGATOIRE RIVER 70830 400496766 Record Clean-up. XTO did not file the change of the Vermejo to being in TA status after the Raton Completion in December 2006. This is to replace the Form 5A submitted 01/10/2007 Doc #01965975. 400496766 400496766 FORM 5A SUBMITTED 400496766.pdf 400496766 400496812 WIRELINE JOB SUMMARY HR 18-16 Wireline Ticket.pdf 148697 400496766 1965975 05A Original w/Raton correct & Vermejo incorrect 400496766 RTON N 1134 1763 66 0.45 N Acidized w/3000 gals 15% HCl acid. Frac'd w/129,628 gals 20# Delta 140 w/sandwedge NT carrying 16,600# 16/30 Brady sand & 213,530# 12/20 Brady sand. 2006-12-20T00:00:00-07:00 24 0 32 48 Pumping 9 6 1 999 SOLD 0 32 48 2 1883 7 8 COAL GAS 2006-11-28T00:00:00-07:00 2006-12-19T00:00:00-07:00 2006-02-18T00:00:00-07:00 PR 2006-12-05T00:00:00-07:00 FRACTURE STIMULATION 400496766 VRMJ N 2440 2680 93 N 2006 Status Changed for reporting purposes. Status change was not reported correctly on DOC #1965975. Recompleted Raton Coal to improve prodution, waiting on formation to dewater before drilling out CIBP & commingling formations. 2006-11-29T00:00:00-07:00 N 2100 0 TA Thread was being aborted.