<_x0034_00106805>
400106805 02 2010-11-12T10:37:57.057-07:00 100322 NOBLE ENERGY INC
1625 BROADWAY STE 2200
DENVER CO 80202 Justin Garrett 303 228-4449 303 228-4286 Justin Garrett Regulatory Specialist 2010-11-12T10:37:57.057-07:00 2010-11-12T10:37:56.977-07:00 UPLOADED garrettjd 2010-11-08T11:26:53.287-07:00 garrettjd JDGarrett@nobleenergyinc.com 2.00000 330222 JDGarrett@nobleenergyinc.com Recompletion In Process FreemanS FreemanS 2010-11-15T15:38:17.327-07:00 400106805 RC GAS MULTIPLE N Held 12-14I8 7555 SESW 12 4N 68W 6 1650 Wattenberg FWL 990 90750 4875 FSL WELD FEE FEE Y 80 E/2SW/4 Sec 12 4N 65W N 345 990 FEET 1845 840 FEET FEET FEET N N N OFFSITE LAND FARMING Closed loop 05 123 18653 00 20030009 ANNULAR PREVENTOR 40.323798 -104.954794 2010-03-30T00:00:00-06:00 Paul Tappy 2.5 Y true 400106805 Conductor Casing will not be used. First String top of cement will be 200' above Niobrara formation. A Form 2A is not required for this recompletion because no pit will be constructed and there will be no additional surface disturbance beyond the originally disturbed area. 400106805 400106805 FORM 2 SUBMITTED 400106805.pdf 400106805 400106816 WELLBORE DIAGRAM Welbbore Schematic.pdf 877557 400106805 1ST 7 7 8 4 1 2 11.6 7540 225 7540 6120 PLANNED 400106805 SURF 12 1 4 8 5 8 24 420 150 420 0 PLANNED 400106805 Codell CODL 407-66 320 W/2 400106805 Niobrara NBRR 407-66 320 W/2
Thread was being aborted.