<_x0034_00108193>
400108193 05 10071 BARRETT CORPORATION* BILL
1099 18TH ST STE 2300
DENVER CO 80202 Brady Riley 303 312-8115 303 291-0420 Brady Riley Permit Analyst 2010-11-12T06:51:44.853-07:00 DRAFT rileyb 2010-11-12T06:51:44.853-07:00 rileyb briley@billbarrettcorp.com 0.00000 briley@billbarrettcorp.com rileyb rileyb 2010-11-12T08:20:33.557-07:00 400108193 05 045 17421 00 GARFIELD DOMMER 32A-26-692 NWSE 26 6S 92W 6 2376 FSL MAMM CREEK 2505 2388 52500 FNL FEL 1998 FEL 2009-07-19T00:00:00-06:00 2512 2009-10-11T00:00:00-06:00 FNL 2009-10-12T00:00:00-06:00 1997 GW FEL 7485 7448 7481 7444 5960 5982 Previously submitted - Triple Combo, Temp Log, AISF, Hole Volume, DEN/NEU Submitted with this form 5 - CBL (post remedial cement work) 39.497618 -107.633201 2010-05-24T00:00:00-06:00 J. Kalmon 6.0 26 6s 92w 26 6s 92w true Final Completion 400108193 This is the final form 5 reporting the revised Cement Top following the remedial cement work performed 3/26-4/1/10. See attached post job report for further details. The Form 4 Subsequent Report for the remedial cement work was submitted to the COGCC on 11/12/10 with the wellbore diagram and daily drilling report. 400108193 400108193 FORM 5 SUBMITTED 400108193.pdf 400108193 400108197 LAS-CEMENT BOND L 04-1-10_barrett_dommer32a-26-692_dcbl.LAS 399010 400108193 400108198 LAS-TRIPLE COMBINATION L 04-1-10_barrett_dommer32a-26-692scbl.LAS 1017204 400108193 400108202 CEMENT JOB SUMMARY Bill Barrett Dommer 32A-26-692 Squeeze Perfs PJR.pdf 107554 400108193 1ST 7 7 8 4 1 2 11.6 7481 675 7485 4470 0 CBL ACTUAL 400108193 CONDUCTOR 26 16 42 40 40 0 0 CALC ACTUAL 400108193 SURF 12 1 4 9 5 8 36 790 240 790 0 0 CALC ACTUAL 400108193 1629 1ST SQUEEZE 6110 365 4454 6030 400108193 cement work 2010-03-26T00:00:00-06:00 400108193 cement work Thread was being aborted.