COGIS - Remediation Reports

Form 27/27A                                                    Related  Doc
Date Submitted: 11/28/2011    
Date Rec'd: 12/2/2011 Assigned by:   John Axelson
DocNum: 1761311 API number:   05-123-34199
Document Type: FORM 27 Project Number:   6723

Operator Information:

Operator: CONTINENTAL RESOURCES INC
Oper. No.

10347

Address: PO BOX 1032  ENID , OK 73703
Type of Facility: WELL
Fac. Name Hahn
County Name: WELD
Operator contact: JAMES BERNAL
qtrqtr: SESE section: 4 township: 7N range: 62W meridian: 6

Remediation Details:


Impacted Media
Media Impacted Extent How Determined?
GROUNDWATER NA
SOILS 5+ ACRES VISUAL INSPECTION
SURFACE WATER NA
VEGETATION 5+ ACRES VISUAL INSPECTION
 
Reason for Report:  OTHER     Cause of Condition:  OTHER     Potential Receptors:  POSSIBLE SEASONAL POND ADJACENT TO THE NE, 1 PERMITTED WELL #235207, ADJACENT PROPERTY N.
  
INITIAL ACTION:   AERIAL PHOTO 1 ILLUSTRATES APPROXIMATE DISTRIBUTION OF INITIAL STOCKPILES AND PHOTO 2 SHOWS APPROXIMATE DISTRIBUTION AS OF 11/21 AFTER MATERIAL WAS SPREAD OVER PROPERTY.
  
SOURCE REMOVED:   DRILLING MUDS WILL BE MIXED AND TILLED IN WITH THE EXISTING TOP SOILS. AS OF 11/21, THE INITIAL SPREADING OF THE MATERIAL OVER THE AREA TO BE TREATED HAD BEEN ACCOMPLISHED. THE INITIAL TILLING OF THE MATERIALS WAS IN PROGRESS.
  
HOW REMEDIATE:   ADDITIONAL TILLING AND MIXING WITH THE TOP SOILS WILL CONTINUE UNTIL THOROUGHLY MIXED. ACTIVITY WILL PROCEED WEATHER PERMITTING. THE GROUND SURFACE REPORTEDLY HAS STARTED TO FREEZE WHICH HAS CURRENTLY LIMITED THE ABILITY TO PENETRATE THROUGH THE SURFACE. IT IS ANTICIPATED THAT THIS TOP SOIL AUGMENTATION WILL IMPROVE THE MOISTURE RETENTION CAPACITY OF THE SOILS AND THEREBY PROMOTE VEGETATION GROWTH. A SEDIMENT BERM OR SEDIMENT FENCING WILL BE PLACED ALONG THE DOWNGRADIENT SIDE OF THE TREATMENT AREA (NW SIDE) TO PROTECT THE TOPOGRAPHIC LOW AREA ADJACENT TO THE SITE.
  
MONITORING PLAN:   GROUND WATER IMPACT HAS NOT BEEN DETERMINED. GROUND WATER IMPACT NOT CONSIDERED LIKELY BASED ON THE TYPE OF MATERIALS PLACED ON THE SITE AND THE DEPTH TO GROUND WATER.
  
5-RECLAMATION PLAN:   DRILLING MUD AND ASSOCIATED LIQUIDS WILL BE MIXED AND TILLED INTO THE SURFACE TOPSOIL MATERIALS. THE SITE WILL BE GRADED AND CONTOURED TO MATCH WITH THE LOCAL LANDSCAPE. THE INITIAL SUCCESS OF THE PROGRAM WILL BE EVALUATED IN THE SPRING/SUMMER OF 2012. IF NECESSARY, RESEEDING MAY OCCUR.

Correspondence Log:


Final Resolution
Date Case Closed? Letter Sent? COGCC person
12/29/2011 Y John Axelson

Continental provided confirmation sample results verifying compliance with Table 910-1 standards. All material was incorporated into native soil. Continental ceased use of location for land application. No further action required.