COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-47411                               Status: DG         10/29/2018
Well Name/No: True Ranch Fee #202-2326H (click well name for production)
Operator: CCRP OPERATING INC - 10665
Status Date: 10/29/2018 Federal or State Lease #:
FacilityID: 456181 LocationID: 456179
County: WELD #123 Location: NENE  23 12N65W 6 PM
Field: WILDCAT  - #99999 Elevation: 5,851 ft.
Planned Location       400 FNL  1260 FEL Lat/Long: 40.99871/-104.62333 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         12/9/2018
Job End Date:  12/12/2018
Reported:   4/5/2019
 
Days to report:  114
 
Wellbore Data for Sidetrack #00                                                    Status: DG         10/29/2018
Spud Date: 10/29/2018 Spud Date is: NOTICE
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 7/22/2020 4:59:10 PM
Prop Depth/Form: 18114 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: 535-670 , Unit Acreage: 1360, Drill Unit: Sec 14 & 23 & 26
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 43
Cement: Sacks: 400, Top: 0, Bottom: 80, Method Grade:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 2100, Weight: 36
Cement: Sacks: 586, Top: 0, Bottom: 2100, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 18114, Weight: 17
Cement: Sacks: 3372, Top: 0, Bottom: 18114, Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 23 Twp: 12N 65W Footage: 600 N  1280 E Depth
Bottom Hole Location:   Sec: 26 Twp: 12N 65W Footages: 600 FSL  1280 FEL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: DG         2/15/2019
1st Production Date: 12/1/2018 Choke Size:
Status Date: 2/15/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: DG
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .