COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-47338                               Status: PR         1/2/2019
Well Name/No: Desha #4-10-2L (click well name for production)
Operator: CONFLUENCE DJ LLC - 10518
Status Date: 1/2/2019 Federal or State Lease #:
FacilityID: 456062 LocationID: 452048
County: WELD #123 Location: SWSW  33 1N65W 6 PM
Field: WATTENBERG  - #90750 Elevation: 5,075 ft.
Planned Location       660 FSL  450 FWL Lat/Long: 40.00235/-104.6768 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         9/22/2018
Job End Date:  10/7/2018
Reported:   11/5/2018
 
Days to report:  29
 
Wellbore Data for Sidetrack #00                                                    Status: PR         1/2/2019
Spud Date: 8/8/2018 Spud Date is: NOTICE
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 7/13/2020 6:21:32 PM
Prop Depth/Form: 17026 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: 407-2425 , Unit Acreage: 1280, Drill Unit: S. 4 & 9
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 43
Cement: Sacks: 400, Top: 0, Bottom: 80, Method Grade:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36
Cement: Sacks: 878, Top: 0, Bottom: 1500, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 17026, Weight: 20
Cement: Sacks: 2295, Top: , Bottom: 17026, Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 4 Twp: 1S 65W Footage: 470 FFNLL  480 FFWLL Depth
Bottom Hole Location:   Sec: 9 Twp: 1S 65W Footages: 470 FFSLL  480 FFWLL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         1/2/2019
1st Production Date: 10/1/2018 Choke Size:
Status Date: 1/2/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .