COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-45805                               Status: PR         2/1/2018
Well Name/No: Kiyota #4N-35H-O367 (click well name for production)
Operator: CRESTONE PEAK RESOURCES OPERATING LLC - 10633
Status Date: 2/1/2018 Federal or State Lease #:
FacilityID: 452879 LocationID: 438722
County: WELD #123 Location: SWSE  35 3N67W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,841 ft.
Planned Location       452 FSL  1429 FEL Lat/Long: 40.175554/-104.853432 Lat/Long Source: Field Measured
As Drilled Location      Footages Not Available Lat/Long: 40.175555/-104.853432 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         1/28/2018
Job End Date:  2/1/2018
Reported:   2/26/2018 Days to report:  25
Wellbore Data for Sidetrack #00                                                    Status: PR         2/1/2018
Spud Date: 11/7/2017 Spud Date is: ACTUAL
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 11/2/2019 11:47:20 AM
Prop Depth/Form: 12005 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing: String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 80, Weight: 30
Cement: Sacks: 80, Top: 0, Bottom: 80, Method Grade:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 2065, Weight: 40
Cement: Sacks: 877, Top: 0, Bottom: 2065, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 12005, Weight: 20
Cement: Sacks: 1721, Top: , Bottom: 12005, Method Grade:
Wellbore Completed
Completion Date: 11/16/2017
Measured TD: 11875 Measured PB depth: 11827
True Vertical TD: 7383 True Vertical PB depth: 7382
Top PZ Location:           Sec: 35 Twp: 3N 67W Footage: 471 FSL  379 FEL Depth
Bottom Hole Location:   Sec: 35 Twp: 3N 67W Footages: 466 FNL  251 FEL Depth
Log Types: PNL, Mud, CBL, MWD
Casing: String Type: CONDUCTOR , Hole Size: 24, Size: 16, Top: 0, Depth: 121, Weight: 52.78
Cement: Sacks: 114, Top: 0, Bottom: 121, Method Grade: VISU
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 2047, Weight: 40
Cement: Sacks: 783, Top: 0, Bottom: 2047, Method Grade: VISU
Casing: String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 11858, Weight: 20
Cement: Sacks: 1729, Top: 0, Bottom: 11858, Method Grade: CBL
Formation Log Top Log Bottom Cored DSTs
SUSSEX 4343
SHANNON 4899
TEEPEE BUTTES 6285
SHARON SPRINGS 7149
NIOBRARA 7259
FORT HAYS 7741
CODELL 7856
Completed information for formation CODL                                     Status: CM         10/30/2018
1st Production Date: N/A Choke Size:
Status Date: 10/30/2018 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment Treatment Type:
Treatment Date: 10/30/2018 Treatment End Date: N/A
Treatment summary: Perfs: 7855-10875
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CODL .
    Perforation Data:
    Interval Bottom: 10875 Interval Top: 7855
    # of Holes: 355 Hole Size: 0.42
Completed information for formation FTHYS                                     Status: CM         10/30/2018
1st Production Date: N/A Choke Size:
Status Date: 10/30/2018 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: FORT HAYS Status: CM
Formation Treatment Treatment Type:
Treatment Date: 10/30/2018 Treatment End Date: N/A
Treatment summary: Perfs: 7741-7855
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation FTHYS .
    Perforation Data:
    Interval Bottom: 7855 Interval Top: 7741
    # of Holes: 355 Hole Size: 0.42
Completed information for formation N-COM                                     Status: PR         2/1/2018
1st Production Date: 11/1/2017 Choke Size:
Status Date: 2/1/2018 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .
Completed information for formation NBFHC                                     Status: PR         3/26/2018
1st Production Date: 2/21/2018 Choke Size:
Status Date: 3/26/2018 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA-FT HAYS-CODELL Status: PR
Formation Treatment Treatment Type: FRACTURE STIMULATION
Treatment Date: 1/28/2018 Treatment End Date: 2/1/2018
Treatment summary: 99139 bbl water, 51 bbls produced brine water, 69 bbl additives (FRP-4K) in a 16 stage frac with 2626540 lb of silica quartz proppant
Total fluid used in treatment (bbls): 99259 Max pressure during treatment (psi): 9122
Total gas used in treatment (mcf): 0 Fluid density (lbs/gal): 8.34
Type of gas: Number of staged intervals: 16
Total acid used in treatment (bbls): Min frac gradient (psi/ft): 0.85
Recycled water used in treatment (bbls): 51 Total flowback volume recovered (bbls): 7623
Produced water used in treatment (bbls): 99139 Disposition method for flowback: RECYCLE
Total proppant used (lbs): 2626540 Green completions techniques utilized: True
Reason green techniques not utilized:
Tubing Size: 2.375 Tubing Setting Depth: 7525
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 3/26/2018 Test Method: flowing
Hours Tested: 24 Gas Type: WET
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 264    
    BBLS_OIL 344    
    BTU_GAS 1276    
    CALC_BBLS_H2O 264    
    CALC_BBLS_OIL 344    
    CALC_GOR 2343    
    CALC_MCF_GAS 806    
    CASING_PRESS 2075    
    GRAVITY_OIL 50    
    MCF_GAS 806    
    TUBING_PRESS 1025    
    Perforation Data:
    Interval Bottom: 11813 Interval Top: 7463
    # of Holes: 355 Hole Size: 0.42
Completed information for formation NBRR                                     Status: CM         10/30/2018
1st Production Date: N/A Choke Size:
Status Date: 10/30/2018 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA Status: CM
Formation Treatment Treatment Type:
Treatment Date: 10/30/2018 Treatment End Date: N/A
Treatment summary: Perfs: 7463-7740; 10876-11786
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation NBRR .
    Perforation Data:
    Interval Bottom: 11786 Interval Top: 7463
    # of Holes: 355 Hole Size: 0.42