COGIS - WELL Information
|
||||||||||
Surface Location Data for API # 05-123-45323 Status: PR 1/23/2019 | ||||||||||
Well Name/No: | 70 Ranch #10-11-1 | (click well name for production) | ||||||||
Operator: | CONFLUENCE DJ LLC - 10518 | |||||||||
Status Date: | 1/23/2019 | Federal or State Lease #: | ||||||||
FacilityID: | 451961 | LocationID: | 451960 | |||||||
County: | WELD #123 | Location: | SENE 10 4N63W 6 PM | |||||||
Field: | WATTENBERG - #90750 | Elevation: | 4,604 ft. | |||||||
Planned Location 2345 FNL 514 FEL | Lat/Long: 40.32758/-104.41692 | Lat/Long Source: Field Measured | ||||||||
Job Date: 10/24/2018 Job End Date: 10/29/2018 |
Reported:
11/13/2018 |
Days to report: 15 |
||||||||
Wellbore Data for Sidetrack #00 Status: PR 1/23/2019 | ||||||||||
Spud Date: | 8/27/2018 | Spud Date is: | NOTICE | |||||||
Wellbore Permit | HORIZONTAL | Permit #: | Expiration Date: | 6/20/2020 10:23:21 PM | ||||||
Prop Depth/Form: | 11595 | Surface Mineral Owner Same: | ||||||||
Mineral Owner: | FEE | Surface Owner: | FEE | |||||||
Unit: | Unit Number: | |||||||||
Formation and Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | |||||||||
Casing: | String Type: CONDUCTOR , Hole Size: 26, Size: 16, Top: 0, Depth: 80, Weight: 43 | |||||||||
Cement: | Sacks: 400, Top: 0, Bottom: 80, Method Grade: | |||||||||
Casing: | String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1500, Weight: 36 | |||||||||
Cement: | Sacks: 787, Top: 0, Bottom: 1500, Method Grade: | |||||||||
Casing: | String Type: 1ST , Hole Size: 8.5, Size: 5.5, Top: 0, Depth: 11595, Weight: 20 | |||||||||
Cement: | Sacks: 1472, Top: , Bottom: 11595, Method Grade: | |||||||||
Wellbore Completed | ||||||||||
Completion Date: | N/A | |||||||||
Measured TD: | Measured PB depth: | |||||||||
True Vertical TD: | True Vertical PB depth: | |||||||||
Top PZ Location: Sec: 11 Twp: 4N 63W | Footage: 470 FNL 470 FWL | Depth | ||||||||
Bottom Hole Location: Sec: 11 Twp: 4N 63W | Footages: 470 FNL 470 FEL | Depth | ||||||||
Formation | Log Top | Log Bottom | Cored | DSTs | ||||||
---|---|---|---|---|---|---|---|---|---|---|
Completed information for formation N-COM Status: PR 1/23/2019 | ||||||||||
1st Production Date: | 11/1/2018 | Choke Size: | ||||||||
Status Date: | 1/23/2019 | Open Hole Completion: | ||||||||
Commingled: | Production Method: | |||||||||
Formation Name: | NOT COMPLETED | Status: | PR | |||||||
Tubing Size: | Tubing Setting Depth: | |||||||||
Tubing Packer Depth: | Tubing Multiple Packer: | |||||||||
Open Hole Top: | Open Hole Bottom: | |||||||||
No Initial Test Data was found for formation N-COM . | ||||||||||
No Perforation Data was found for formation N-COM . |