COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-38974                               Status: PR         4/1/2019
Well Name/No: Pronghorn #K-O-18HNC (click well name for production)
Operator: BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
Status Date: 4/1/2019 Federal or State Lease #:
FacilityID: 436199 LocationID: 436197
County: WELD #123 Location: LOT1  18 5N61W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,569 ft.
Planned Location       220 FNL  1311 FWL Lat/Long: 40.4079/-104.25719 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         4/23/2014
Job End Date:  4/25/2014
Reported:   6/9/2014
 
Days to report:  45
 
Wellbore Data for Sidetrack #00                                                    Status: PR         4/1/2019
Spud Date: 3/27/2014 Spud Date is: ACTUAL
Wellbore Permit   HORIZONTAL
Permit #: Expiration Date: 2/22/2016 12:12:28 PM
Prop Depth/Form: 10964 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: 407-633 , Unit Acreage: 639, Drill Unit: Sec. 18:ALL
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 410, Weight: 36
Cement: Sacks: 200, Top: 0, Bottom: 410, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 7, Top: 0, Depth: 6636, Weight: 26
Cement: Sacks: 500, Top: 2500, Bottom: 6636, Method Grade:
Casing: String Type: 1ST LINER , Hole Size: 6.125, Size: 4.5, Top: 6536, Depth: 10964, Weight: 11.6
Cement: Sacks: , Top: , Bottom: , Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 18 Twp: 5N 61W Footage: 631 N  2646 E Depth
Bottom Hole Location:   Sec: 18 Twp: 5N 61W Footages: 470 FSL  2637 FWL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         4/1/2019
1st Production Date: N/A Choke Size:
Status Date: 4/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .