COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-23525                               Status: PR         2/1/2018
Well Name/No: WILSON #35-24 (click well name for production)
Operator: BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
Status Date: 2/1/2018 Federal or State Lease #:
FacilityID: 282642 LocationID: 305819
County: WELD #123 Location: SENW  35 7N66W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,845 ft.
Planned Location       1940 FNL  2058 FWL Lat/Long: 40.533529/-104.747211 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 40.53352/-104.74732 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PR         2/1/2018
Spud Date: 7/21/2006 Spud Date is: ACTUAL
Wellbore Permit  
Permit #: 20054747 Expiration Date: 1/16/2007
Prop Depth/Form: 7550 Surface Mineral Owner Same: Y
Mineral Owner: FEE Surface Owner:
Unit: Unit Number:
Formation and Spacing: Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-1 , Unit Acreage: 80, Drill Unit: E2NW
Wellbore Completed
Completion Date: 7/25/2006
Measured TD: 7506 Measured PB depth: 7462
True Vertical TD: True Vertical PB depth:
Log Types: CBL/GR. CDC/GR, DUAL IND/GR
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 447, Weight:
Cement: Sacks: 210, Top: 0, Bottom: 447, Method Grade:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 7478, Weight:
Cement: Sacks: 710, Top: 2333, Bottom: 7506, Method Grade: CBL
Formation Log Top Log Bottom Cored DSTs
PARKMAN 3750 4156 N N
SUSSEX 4528 4605 N N
SHANNON 4971 5053 N N
NIOBRARA 6988 7266 N N
CODELL 7319 7340 N N
Completed information for formation CODL                                     Status: CM         1/1/2011
1st Production Date: 8/28/2006 Choke Size:
Status Date: 1/1/2011 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment
Treatment Date: 8/12/2006    
Treatment summary: FRAC'D CODELL/NBRR W/350,634# 30/50 SAND USING 104,821 GAL 26# SILVERSTIM
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation CODL .
    Perforation Data:
    Interval Bottom: 7335 Interval Top: 7320
    # of Holes: 60 Hole Size: 0.38
Completed information for formation NB-CD                                     Status: PR         2/1/2018
1st Production Date: N/A Choke Size: 0.188
Status Date: 2/1/2018 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA-CODELL Status: PR
Formation Treatment
Treatment Date: 9/11/2006    
Treatment summary:
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 9/11/2006 Test Method: FLOWING
Hours Tested: 24 Gas Type: SHALE
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 3    
    BBLS_OIL 34    
    CALC_GOR 2529    
    CASING_PRESS 200    
    MCF_GAS 86    
    Perforation Data:
    Interval Bottom: 7335 Interval Top: 7133
    # of Holes: 86 Hole Size: 0.38
Completed information for formation NBRR                                     Status: CM         1/1/2011
1st Production Date: 8/26/2006 Choke Size:
Status Date: 1/1/2011 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA Status: CM
Formation Treatment
Treatment Date: 8/12/2006    
Treatment summary: FRA'C CODELL/NBRR W/350,634# 30/50 SAND USING 104,821 GAL 26# SILVERSTIM
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation NBRR .
    Perforation Data:
    Interval Bottom: 7154 Interval Top: 7133
    # of Holes: 26 Hole Size: 0.38