COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-22873                               Status: PA         6/14/2018
Well Name/No: SHUPE 5 SPOT #B10 (click well name for production)
Operator: EXTRACTION OIL & GAS INC - 10459
Status Date: 6/14/2018 Federal or State Lease #:
FacilityID: 276937 LocationID: 332837
County: WELD #123 Location: NENE  20 5N65W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,669 ft.
Planned Location       150 FNL  874 FEL Lat/Long: 40.391415/-104.680999 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 40.39145/-104.68097 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PA         5/16/2018
Spud Date: 8/25/2005 Spud Date is: ACTUAL
Wellbore Permit   DIRECTIONAL
Permit #: 20050595 Expiration Date: 4/3/2006
Prop Depth/Form: 8040 Surface Mineral Owner Same: N
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit:
Formation and Spacing: Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit:
Formation and Spacing: Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE/4
Wellbore Completed
Completion Date: 9/22/2005
Measured TD: 7600 Measured PB depth: 7585
True Vertical TD: 7324 True Vertical PB depth: 7309
Top PZ Location:           Sec: 17 Twp: 5N 65W Footage: 1295 S  1322 E Depth
Bottom Hole Location:   Sec: 17 Twp: 5N 65W Footages: 1295 FSL  1322 FEL Depth
Log Types: DIL, DEN, NEU, CBL
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 498, Weight: 24
Cement: Sacks: 260, Top: 0, Bottom: 498, Method Grade: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 7588, Weight: 11.6
Cement: Sacks: 480, Top: 3950, Bottom: 7588, Method Grade: CBL
Formation Log Top Log Bottom Cored DSTs
SUSSEX 4518 4615 N N
NIOBRARA 7037 7340 N N
CODELL 7362 7378 N N
Completed information for formation CODL                                     Status: CM         12/24/2009
1st Production Date: N/A Choke Size:
Status Date: 12/24/2009 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment
Treatment Date: 12/2/2009    
Treatment summary: RE-PERF EXISTING CD 7362-7378, 7402-7407. RE-FRAC CODELL 7362'-7378' W/ 119,994 GAL HYBRID 26# PHASER FRAC AND 250,000# 20/40 SANDS.
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: N/A Test Method:
Hours Tested: Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 10    
    BBLS_OIL 33    
    BTU_GAS 1255    
    CALC_BBLS_H2O 10    
    CALC_BBLS_OIL 33    
    CALC_GOR 11515    
    CALC_MCF_GAS 380    
    CASING_PRESS 620    
    GRAVITY_OIL 57    
    MCF_GAS 380    
    Perforation Data:
    Interval Bottom: 7407 Interval Top: 7362
    # of Holes: 84 Hole Size: 0.42
Completed information for formation NB-CD                                     Status: AB         6/14/2018
1st Production Date: 12/11/2009 Choke Size: 0.250
Status Date: 6/14/2018 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA-CODELL Status: AB
Formation Treatment
Treatment Date: 12/4/2009    
Treatment summary:
Tubing Size: 2.375 Tubing Setting Depth: 7321
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 12/24/2009 Test Method: FLOWING
Hours Tested: 24 Gas Type: SHALE
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 0    
    BBLS_OIL 18    
    BTU_GAS 1274    
    CALC_BBLS_H2O 0    
    CALC_BBLS_OIL 18    
    CALC_GOR 15722    
    CALC_MCF_GAS 283    
    CASING_PRESS 1720    
    GRAVITY_OIL 62    
    MCF_GAS 283    
    Perforation Data:
    Interval Bottom: 7407 Interval Top: 7048
    # of Holes: 364 Hole Size: 0.42
Completed information for formation NBRR                                     Status: CM         12/24/2009
1st Production Date: N/A Choke Size:
Status Date: 12/24/2009 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA Status: CM
Formation Treatment
Treatment Date: 12/3/2009    
Treatment summary: FRAC NIOBRARA B 7178-94'; C 7246-60', W/219,996 GAL HYBRID PHASER FRAC, 53,750 # 40/70 SAND, 240,000# 20/40 SAND. 12/3/2009 FRAC NIOBRARA A 7048-7068', 7082-7092 W/ 109,494 GAL HYBRID PHASER FRAC, 15,000 # 40/70 SAND, 160,000# 20/40 SAND. 12/4/2009
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation NBRR .
    Perforation Data:
    Interval Bottom: 7260 Interval Top: 7048
    # of Holes: 240 Hole Size: 0.42