COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-22872                               Status: PA         6/14/2018
Well Name/No: SMITH 5 SPOT #A4 (click well name for production)
Operator: EXTRACTION OIL & GAS INC - 10459
Status Date: 6/14/2018 Federal or State Lease #:
FacilityID: 276938 LocationID: 332837
County: WELD #123 Location: NENE  20 5N65W 6 PM
Field: WATTENBERG  - #90750 Elevation: 4,669 ft.
Planned Location       235 FNL  750 FEL Lat/Long: 40.391175/-104.680559 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 40.3912/-104.68051 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PA         6/14/2018
Spud Date: 9/27/2005 Spud Date is: ACTUAL
Wellbore Permit   DIRECTIONAL
Permit #: 20050593 Expiration Date: 4/3/2006
Prop Depth/Form: 8370 Surface Mineral Owner Same: N
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit:
Formation and Spacing: Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit:
Formation and Spacing: Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Wellbore Completed
Completion Date: 10/2/2005
Measured TD: 7752 Measured PB depth: 7707
True Vertical TD: 7268 True Vertical PB depth: 7224
Top PZ Location:           Sec: 16 Twp: 5N 65W Footage: 1198 S  1223 W Depth
Bottom Hole Location:   Sec: 16 Twp: 5N 65W Footages: 1198 FSL  1223 FWL Depth
Log Types: CNL, CBL
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 461, Weight: 24
Cement: Sacks: 240, Top: 0, Bottom: 461, Method Grade: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 7732, Weight: 11.6
Cement: Sacks: 518, Top: 4020, Bottom: 7732, Method Grade: CBL
Formation Log Top Log Bottom Cored DSTs
SUSSEX 4274 4410 N N
NIOBRARA 7238 7535 N N
CODELL 7557 7760 N N
Completed information for formation CODL                                     Status: CM         12/22/2009
1st Production Date: N/A Choke Size:
Status Date: 12/22/2009 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: CODELL Status: CM
Formation Treatment
Treatment Date: 12/1/2009    
Treatment summary: RE-PERFORATE EXISTING CODELL 7560'-7574' & 7598'-7603 RE-FRAC CODELL 7560'-7574' W/ 130,242 GAL HYBRID 26# PHASER FRAC AND 250,000# 20/40 SAND.
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: N/A Test Method:
Hours Tested: Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 1    
    BBLS_OIL 20    
    BTU_GAS 1198    
    CALC_BBLS_H2O 1    
    CALC_BBLS_OIL 20    
    CALC_GOR 6700    
    CALC_MCF_GAS 134    
    CASING_PRESS 460    
    GRAVITY_OIL 55    
    MCF_GAS 134    
    Perforation Data:
    Interval Bottom: 7603 Interval Top: 7560
    # of Holes: 76 Hole Size: 0.42
Completed information for formation NB-CD                                     Status: AB         6/14/2018
1st Production Date: 12/10/2009 Choke Size: 0.250
Status Date: 6/14/2018 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA-CODELL Status: AB
Formation Treatment
Treatment Date: 12/2/2009    
Treatment summary:
Tubing Size: 2.375 Tubing Setting Depth: 7537
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 12/22/2009 Test Method: FLOWING
Hours Tested: 24 Gas Type: SHALE
Gas Disposal: SOLD
Test Type Measure
    BBLS_OIL 19    
    BTU_GAS 1271    
    CALC_BBLS_H2O 0    
    CALC_BBLS_OIL 19    
    CALC_GOR 14263    
    CALC_MCF_GAS 271    
    CASING_PRESS 2000    
    GRAVITY_OIL 62    
    MCF_GAS 271    
    Perforation Data:
    Interval Bottom: 7603 Interval Top: 7246
    # of Holes: 308 Hole Size: 0.42
Completed information for formation NBRR                                     Status: CM         12/22/2009
1st Production Date: N/A Choke Size:
Status Date: 12/22/2009 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA Status: CM
Formation Treatment
Treatment Date: 12/2/2009    
Treatment summary: FRAC NIOBRARA A 7246-60', 7282-88'; B 7370-88'; C 7442-52', W/219,996 GAL HYBRID PHASER FRAC, 53,750# 40/70 SAND, 240,000# 20/40 SAND.
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation NBRR .
    Perforation Data:
    Interval Bottom: 7452 Interval Top: 7246
    # of Holes: 192 Hole Size: 0.42