COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-15492                               Status: SI         11/1/2017
Well Name/No: CHRISTIANSEN #1-35 (click well name for production)
Operator: SRC ENERGY INC - 10311
Status Date: 11/1/2017 Federal or State Lease #: 63651
FacilityID: 247695 LocationID: 328062
County: WELD #123 Location: SENE  35 6N67W 6 PM
Field: LAPOUDRE SOUTH  - #48130 Elevation: 4,729 ft.
Planned Location       1980 FNL  1181 FEL Lat/Long: 40.445193/-104.855605 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 40.444839/-104.85559 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: SI         11/1/2017
Wellbore Permit  
Permit #: 911301 Expiration Date: 7/15/1997
Prop Depth/Form: Surface Mineral Owner Same: N
Mineral Owner: FEE Surface Owner:
Unit: Unit Number:
Formation and Spacing: Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: NE4
Wellbore Completed
Completion Date: 12/3/1992
Measured TD: 7615 Measured PB depth: 7531
True Vertical TD: 0 True Vertical PB depth:
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 316, Weight:
Cement: Sacks: 300, Top: 0, Bottom: , Method Grade:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 7614, Weight:
Cement: Sacks: 0, Top: 0, Bottom: , Method Grade:
Formation Log Top Log Bottom Cored DSTs
CODELL 7048
J SAND 7512
Completed information for formation CODL                                     Status: CM         5/25/2017
1st Production Date: 10/13/1995 Choke Size:
Status Date: 5/25/2017 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: CODELL Status: CM
Formation Treatment Treatment Type:
Treatment Date: 3/15/2013 Treatment End Date: N/A
Treatment summary: 7/26/2008 Remove CIBP and commingle with Nio.
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Formation Treatment
Treatment Date: 12/3/1992    
Treatment summary:
Tubing Size: 2.375 Tubing Setting Depth: 2522
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: N/A Test Method:
Hours Tested: Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 2    
    BBLS_OIL 20    
    CALC_BBLS_H2O 16    
    CALC_BBLS_OIL 160    
    CALC_GOR 3450    
    CALC_MCF_GAS 552    
    CASING_PRESS 850    
    MCF_GAS 69    
    TUBING_PRESS 150    
    Perforation Data:
    Interval Bottom: 7061 Interval Top: 7050
    # of Holes: 80 Hole Size: 0.42
Completed information for formation JSND                                     Status: AB         5/25/2017
1st Production Date: 3/31/1994 Choke Size:
Status Date: 5/25/2017 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: J SAND Status: AB
Formation Treatment
Treatment Date: 9/26/1995    
Treatment summary: P&A, CIBP set @7440' with 2 sxs cmt
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation JSND .
    Perforation Data:
    Interval Bottom: 7524 Interval Top: 7515
    # of Holes: 72 Hole Size: 0.32
Completed information for formation NB-CD                                     Status: AB         5/25/2017
1st Production Date: 2/5/2008 Choke Size:
Status Date: 5/25/2017 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA-CODELL Status: AB
Formation Treatment
Treatment Date: 1/9/2009    
Treatment summary: Commingle Nio and Cdl
Tubing Size: 2.375 Tubing Setting Depth: 2522
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: N/A Test Method:
Hours Tested: Gas Type:
Gas Disposal:
Test Type Measure
    BTU_GAS 1286    
    CALC_BBLS_H2O 1    
    CALC_BBLS_OIL 10    
    CALC_GOR 13    
    CALC_MCF_GAS 130    
    CASING_PRESS 420    
    GRAVITY_OIL 52    
    TUBING_PRESS 400    
    Perforation Data:
    Interval Bottom: 7061 Interval Top: 6851
    # of Holes: 172 Hole Size:
Completed information for formation NBRR                                     Status: CM         3/1/2013
1st Production Date: 2/5/2008 Choke Size:
Status Date: 3/1/2013 Open Hole Completion: N
Commingled: Y Production Method:
Formation Name: NIOBRARA Status: CM
Formation Treatment Treatment Type:
Treatment Date: 3/15/2013 Treatment End Date: N/A
Treatment summary: Frac info reported on 5A 9/25/008
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls):
Produced water used in treatment (bbls): Disposition method for flowback:
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized:
Formation Treatment
Treatment Date: 1/29/2008    
Treatment summary: FRAC'D NIOBRARA W/ 241,194# 20/40 SAND & 12,000# SB EXCEL USING 76,777 GAL 14# VISTAR. ADDED NIOBRARA
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: N/A Test Method:
Hours Tested: Gas Type: SHALE
Gas Disposal:
Test Type Measure
    BBLS_H2O 3    
    BBLS_OIL 25    
    BTU_GAS 1293    
    CALC_GOR 9160    
    CASING_PRESS 420    
    GRAVITY_OIL 50    
    MCF_GAS 229    
    TUBING_PRESS 380    
    Perforation Data:
    Interval Bottom: 6874 Interval Top: 6851
    # of Holes: 92 Hole Size: 0.42
Completed information for formation SNSD                                     Status: AB         5/25/2017
1st Production Date: N/A Choke Size:
Status Date: 5/25/2017 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: SHANNON Status: AB
Formation Treatment
Treatment Date: 8/24/1996    
Treatment summary: Perfs 4520-4524, 4526-4532. Acidized w/750 gal 15% Acetic Acid. Never produced. Squeezed perfs w/50 sxs cmt 8/26/1996
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation SNSD .
    Perforation Data:
    Interval Bottom: 4532 Interval Top: 4520
    # of Holes: 32 Hole Size: