COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-123-13557                               Status: PR         12/10/2018
Well Name/No: BUCKLIN #11-31 (click well name for production)
Operator: SRC ENERGY INC - 10311
Status Date: 12/10/2018 Federal or State Lease #: 55815
FacilityID: 245762 LocationID: 326722
County: WELD #123 Location: NESW  31 6N65W 6 PM
Field: GREELEY  - #32760 Elevation: 4,650 ft.
Planned Location       2057 FSL  1991 FWL Lat/Long: 40.442962/-104.708755 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 40.441351/-104.708422 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PR         12/10/2018
Wellbore Permit  
Permit #: 870460 Expiration Date: 11/4/1987
Prop Depth/Form: Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner:
Unit: Unit Number:
Formation and Spacing: Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 0, Drill Unit:
Wellbore Completed
Completion Date: 10/1/1987
Measured TD: 7165 Measured PB depth: 7152
True Vertical TD: 7165 True Vertical PB depth:
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 314, Weight:
Cement: Sacks: 0, Top: 0, Bottom: , Method Grade:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 4.5, Top: 0, Depth: 7165, Weight:
Cement: Sacks: 0, Top: 0, Bottom: , Method Grade:
Formation Log Top Log Bottom Cored DSTs
NIOBRARA 6774
CODELL 7081
Completed information for formation N-COM                                     Status: PR         12/10/2018
1st Production Date: 10/1/2018 Choke Size:
Status Date: 12/10/2018 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .
Completed information for formation NB-CD                                     Status: PR         4/1/2018
1st Production Date: 10/30/1987 Choke Size: 18.000
Status Date: 4/1/2018 Open Hole Completion: N
Commingled: N Production Method: PLUNGER
Formation Name: NIOBRARA-CODELL Status: PR
Formation Treatment
Treatment Date: 10/1/1987    
Treatment summary: FRACED W/ 122,934 GALLONS GELLED FLUID, 261260 LBS 20/40 UNIMIN - LUCERNE, 0 LBS, 0 LBS PERFORATE CODELL 7082-7092 PROUDCTION REFLECTS NIOBRARA - CODELL FORMATIONS
Tubing Size: 2.375 Tubing Setting Depth: 7040
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 7/12/2001 Test Method:
Hours Tested: 8 Gas Type: SHALE
Gas Disposal:
Test Type Measure
    BBLS_OIL 10    
    CALC_BBLS_OIL 10    
    CALC_GOR 12900    
    CALC_MCF_GAS 129    
    CASING_PRESS 713    
    MCF_GAS 129    
    TUBING_PRESS 630    
    Perforation Data:
    Interval Bottom: 7095 Interval Top: 6776
    # of Holes: 16 Hole Size: 0.3