COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-073-06709                               Status: PR         6/1/2016
Well Name/No: Good Deal #13 (click well name for production)
Operator: WIEPKING-FULLERTON ENERGY LLC - 96340
Status Date: 6/1/2016 Federal or State Lease #: 9364.7
FacilityID: 443455 LocationID: 443451
County: LINCOLN #073 Location: SWSW  16 10S55W 6 PM
Field: WILDCAT  - #99999 Elevation: 5,165 ft.
Planned Location       810 FSL  660 FWL Lat/Long: 39.17375/-103.56364 Lat/Long Source: Field Measured
As Drilled Location      Footages Not Available Lat/Long: 39.17375/-103.56364 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PR         6/1/2016
Spud Date: 10/26/2015 Spud Date is: ACTUAL
Wellbore Permit  
Permit #: Expiration Date: 11/7/2020 4:31:20 PM
Prop Depth/Form: 8010 Surface Mineral Owner Same:
Mineral Owner: STATE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CRTC , Formation: CRETACEOUS , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit:
Casing: String Type: CONDUCTOR , Hole Size: 17.5, Size: 13.375, Top: 0, Depth: 60, Weight: 48
Cement: Sacks: 100, Top: 0, Bottom: 60, Method Grade:
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 300, Weight: 24
Cement: Sacks: 175, Top: 0, Bottom: 300, Method Grade:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 7986, Weight: 17
Cement: Sacks: 418, Top: 4870, Bottom: 7986, Method Grade:
Casing: String Type: S.C. 1.1 , Hole Size: , Size: , Top: , Depth: , Weight:
Cement: Sacks: 100, Top: 3950, Bottom: 4550, Method Grade:
Wellbore Completed
Completion Date: 11/20/2015
Measured TD: 8010 Measured PB depth: 7946
True Vertical TD: True Vertical PB depth:
Log Types: Combo Log LAS, Dual Induction Gamma Ray, Compensated Density Compensated Newtron Gamma Ray, Radial Cement Bond Log
Casing: String Type: CONDUCTOR , Hole Size: 17.5, Size: 13.375, Top: 0, Depth: 60, Weight: 48
Cement: Sacks: 100, Top: 0, Bottom: 60, Method Grade: VISU
Casing: String Type: SURF , Hole Size: 12.25, Size: 8.625, Top: 0, Depth: 300, Weight: 24
Cement: Sacks: 175, Top: 0, Bottom: 300, Method Grade: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 7986, Weight: 17
Cement: Sacks: 418, Top: 4870, Bottom: 7986, Method Grade: CBL
Additional Cement: String Type: 1ST , Top: 2930, Depth: 4608, Bottom: 4666, Sacks: 250, Method Grade: STAGE TOOL
Formation Log Top Log Bottom Cored DSTs
NIOBRARA 3025
CODELL 3574
STONE CORRAL 5438
LANSING 6546
TORCH 6897
PAWNEE A 6937
PAWNEE B 6954 Y
CHEROKEE 7014 Y
MORROW V-11 7654
OSAGE 7854
Completed information for formation MRV11                                     Status: AB         12/3/2015
1st Production Date: N/A Choke Size:
Status Date: 12/3/2015 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: MORROW V-11 Status: AB
Formation Treatment Treatment Type:
Treatment Date: 12/3/2015 Treatment End Date: N/A
Treatment summary: 12-2-2015 perf Morrow V-11 formation 7654' - 7664', set packer @ 7611' no treatment, SWAB recover all water 12-3-2015 set CIBP @ 7620' with 2sks cement
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls): 105
Produced water used in treatment (bbls): Disposition method for flowback: DISPOSAL
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized: PIPELINE
Tubing Size: 2.875 Tubing Setting Depth: 7611
Tubing Packer Depth: 7611 Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 12/2/2015 Test Method: SWAB
Hours Tested: 8 Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 35    
    CALC_BBLS_H2O 105    
    Perforation Data:
    Interval Bottom: 7664 Interval Top: 7654
    # of Holes: 40 Hole Size: 0.25
Completed information for formation OSAGE                                     Status: AB         12/2/2015
1st Production Date: N/A Choke Size:
Status Date: 12/2/2015 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: OSAGE Status: AB
Formation Treatment Treatment Type:
Treatment Date: 12/2/2015 Treatment End Date: N/A
Treatment summary: 12-1-2015 pef Osage formation 7854' - 7866' set packer @ 7760' no treatment, SWAB recover all water 12-2-2015 set CIBP @ 7830' with 2 sks cement
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls): 24
Produced water used in treatment (bbls): Disposition method for flowback: DISPOSAL
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized: PIPELINE
Tubing Size: 2.875 Tubing Setting Depth: 7760
Tubing Packer Depth: 7760 Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 12/1/2015 Test Method: SWAB
Hours Tested: 8 Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 8    
    CALC_BBLS_H2O 24    
    Perforation Data:
    Interval Bottom: 7866 Interval Top: 7854
    # of Holes: 48 Hole Size: 0.25
Completed information for formation PAWNA                                     Status: PR         6/1/2016
1st Production Date: N/A Choke Size:
Status Date: 6/1/2016 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: PAWNEE A Status: PR
Formation Treatment Treatment Type:
Treatment Date: 12/29/2015 Treatment End Date: N/A
Treatment summary: 12-3-2015 perf Pawnee A formation 6936' - 6944' set packer @ 6856', no treatment, SWAB recover in 24 hrs 51 oil and 14 water. 12-7-2015 TA well waiting on production equipment
Total fluid used in treatment (bbls): Max pressure during treatment (psi):
Total gas used in treatment (mcf): Fluid density (lbs/gal):
Type of gas: Number of staged intervals:
Total acid used in treatment (bbls): Min frac gradient (psi/ft):
Recycled water used in treatment (bbls): Total flowback volume recovered (bbls): 66
Produced water used in treatment (bbls): Disposition method for flowback: DISPOSAL
Total proppant used (lbs): Green completions techniques utilized:
Reason green techniques not utilized: PIPELINE
Tubing Size: 2.875 Tubing Setting Depth: 6856
Tubing Packer Depth: 6856 Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 12/3/2015 Test Method: SWAB
Hours Tested: 8 Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 5    
    BBLS_OIL 17    
    CALC_BBLS_H2O 14    
    CALC_BBLS_OIL 51    
    GRAVITY_OIL 36    
    Perforation Data:
    Interval Bottom: 6944 Interval Top: 6936
    # of Holes: 32 Hole Size: 0.25